My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3674-19
>
Ordinances
>
Ordinance 3674-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:57:10 AM
Creation date
5/21/2019 10:56:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3674-19
Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 TO ORDINANCE <br /> 9.1 Transportation Impact Fees. The following is added as second and third <br /> paragraphs to Section 9.1: <br /> In 2019, Riverfront provided an updated traffic analysis for the Riverfront Project in <br /> advance of the City's EIS Addendum. Riverfront will pay the traffic impact fees required <br /> by Ch. 18.40 EMC. In 2019 or 2020,the City may revise its transportation impact fees in <br /> Ch. 18.40 EMC ("Revised Transportation Fees"). If the City does so revise, then, <br /> starting on the effective date of such Revised Transportation Fees, Riverfront will pay the <br /> Revised Transportation Fees for each new building prior to issuance of a building permit <br /> for each structure. The Revised Transportation Fees, if adopted, shall apply to the <br /> Riverfront Project from the date the revised fees are effective until the date that is eight <br /> years from the Effective Date of this Second Amendment. If the City does not revise its <br /> transportation impact fees in Ch. 18.40 EMC in 2019 or 2020, Riverfront will pay the <br /> fees in Ch. 18.40 EMC in effect on the Effective Date of this Second Amendment and <br /> these fees shall apply to the Riverfront Project for eight years from such Effective Date. <br /> 9.2 School Impact Fees. With respect to the Developer Property, Riverfront shall pay <br /> School Impact Fees in accordance with the City's adopted school impact fee ordinance EMC <br /> 18.44,unless separate written agreement is entered into between Riverfront and the Everett School <br /> District. <br /> 10. Vesting of Development Standards. Section 10.1 of the Development Agreement is <br /> revised to read as follows: <br /> 10.1 Vesting. Pursuant to RCW 36.70B.170 et seq.,the Development Standards <br /> and other provisions of this Agreement, and the Development Regulations specified in <br /> Section 10.3 shall apply to and govern development on the Riverfront Property excluding <br /> the Developer Property for a period of twenty years from the date of this Agreement, <br /> provided that with respect to development on the Developer Property,the period of vesting <br /> shall run for twenty years from the Date of this Second Amendment(the "Vesting Period"). <br /> During the Vesting Period (including any complete applications submitted within the <br /> Vesting Period), the City shall not modify or impose new or additional development <br /> standards beyond those set forth in this Agreement except as stated below. To the extent <br /> this Agreement does not establish Development Standards or provisions addressing a <br /> certain subject, element or condition of the Project, then the Project shall be governed by <br /> the City's Development Regulations specified in Section 10.3 below. To the extent that <br /> neither (a) this Agreement's Development Standards or other provisions nor (b) the City's <br /> Development Regulations specified in Section 10.3 below address a certain subject, <br /> element or condition of the Project, then the Project shall be governed by the City's then- <br /> existing development regulations. <br /> 11. Water, Sanitary and Storm Sewer Facilities. Section 11 of the Development Agreement <br /> titled "Water and Sewer Service" is deleted in its entirety. The City certifies that the water and <br /> sanitary and storm sewer infrastructure already constructed is sufficient to serve the preferred <br /> alternative described in the FEIS once Riverfront constructs the connections to such water and <br /> sewer infrastructure. The Riverfront Project in later phases may require certain upgrades (such as <br /> higher capacity lift station pumps), which the City certifies the City will complete at its cost when <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.