Laserfiche WebLink
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> impacts to views and scenic vistas. Measures to protect views and scenic vistas <br /> may include,but are not limited to: grouping large trees in clusters,selecting <br /> species that grow to heights that allow views without requiring maintenance <br /> pruning,and clustering evergreens.No above ground structures associated with the <br /> rain gardens is allowed in the required buffers this does not include the end of <br /> drainage pipes which daylight into the rain gardens. <br /> Energy and Natural Resources B: All development shall comply with the All development DEIS 4.6.4.2 RC Building Permits <br /> Washington State Energy Code. <br /> Energy and Natural Resources C: Apply high-performance,energy-efficient All Areas of DEIS 4.6.4.3 RC PDA Compliance <br /> building design and construction standards for new construction on the project site. development All Areas <br /> Use of a nationally recognized system of standards such as LEED for new of development <br /> construction as guidance at the site would create a record of measurable <br /> efficiencies and mitigating actions. <br /> Energy and Natural Resources D: To the extent set forth in the PDA or the All Areas of DEIS 4.6.4.4 RC PDA and <br /> Development Agreement as amended,use sustainable building and development development All Areas Development <br /> practices.cuch as those found in the U.S. Green Building Council's Leadership in of development Agreement <br /> Energy and Environmental Design(LEED)system. Compliance <br /> Energy and Natural Resources:. Sunlight is a renewable energy source that could All development DEIS 4.6.5.4 RC Encouraged to be <br /> be put to limited use at the project site. Some limited, small-scale uses could be included in the <br /> developed as part of the project design -. ._ •- __. • _•.. •. design stage <br /> programs such as LEED. The City encourages RC to include solar energy to meet considerations <br /> a portion of the energy demand for the development. and <br /> implemented by <br /> developer <br /> Land and Shoreline Use, Visual Quality,Light and Glare AA: All development All Development DEIS 5.1.8 RC PDO,PDA <br /> must be consistent with the standards and design guidelines in the PDO and PDA. <br /> Visual/Light and Glare A:Utilize Mixed Use Design criteria to guide the All Development on DEIS 5.2.12.1 RC PDO, land <br /> development on the project site. Landfill and Eclipse division,building <br /> permits <br /> I-11 <br />