My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3674-19
>
Ordinances
>
Ordinance 3674-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:57:10 AM
Creation date
5/21/2019 10:56:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3674-19
Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> prior to RC <br /> beginning gravel <br /> trail.) <br /> Parks and Recreation D:Not applicable to Landfill <br /> Historical and Cultural Resources A:Not applicable to Landfill <br /> Transportation A: A traffic management plan shall be created prior to Any Construction DEIS5.5.17 Responsible Development <br /> construction of any development that will outline steps for minimizing traffic party doing the Permits <br /> impacts during construction activities, including: work/project <br /> • Providing advanced notice to adjacent landowners and businesses prior to <br /> construction to help minimize access disruptions. <br /> • Providing proper road signage and warnings,such as"Truck Access," <br /> "Equipment on Road"or"Road Crossings." <br /> • When slow or oversized wide loads are being hauled,using advance <br /> signage and traffic diversion equipment to improve traffic safety. <br /> Transportation B: Pacific Avenue at I-5 Northbound Off-ramp. It would be All Development DEIS 5.5.18.1 RC PDO,Issuance of <br /> feasible to install a signal at this intersection. Approximately 18.2 percent of the Building permits <br /> 2030 traffic volumes through the intersection could be attributable to the Project. <br /> RC shall pay a 18.2 percent proportionate share of this improvement. <br /> Transportation C: 52nd Street at 2nd Avenue. The installation of a signal would All Development DEIS 5.5.18.10 RC PDO,Issuance of <br /> improve the intersection to an acceptable LOS. 4.7 percent of the traffic's pm Building permits <br /> peak hour trips going through the signal could be attributable to the Project. RC <br /> shall pay 4.7 percent of the cost of this signal. <br /> Transportation D:Not applicable to Landfill <br /> Transportation E: Transportation mitigation fees per EMC 18.40 All Development DEIS 5.5.18.11 RC Issuance of <br /> Building Permits <br /> I-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.