Laserfiche WebLink
5; INSPECTION REPORT <br /> - <br /> Date111 Permit:4V I '^0o1 <br /> m, _ / ' <br /> V { / <br /> Contractor: Wegge01(1 <br /> QyvntIO i' V t-att 4.4 I I 1 <br /> Site Address: no_11 _ <br /> TYPE OF INSPECTION REQUESTED <br /> `ICAC BUILDING MECHANICAL PLUMBING <br /> • emp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> I.. •iduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> 4,-:Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> • e ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ['Gas Piipe�Fiinaall ❑HWT Final <br /> OT CONSULTATION: �_ala ' C1\R1_Vl <br /> ®.JrPPRO L ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK T.C.O. ❑ CORRECTION REQUESTED <br /> [MEl <br /> FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881-( FOR�REINSPECTION—24 hour notice required <br /> ® 043ce6 i 1 r Ac—.fit/z4 <br /> Inspector: ' 710fDate: /iy <br /> EIR(10/06) DATABAR,INC. <br />