My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
603 WINTON AVE 2019-05-22
>
Address Records
>
WINTON AVE
>
603
>
603 WINTON AVE 2019-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:00:25 PM
Creation date
5/22/2019 12:00:22 PM
Metadata
Fields
Template:
Address Document
Street Name
WINTON AVE
Street Number
603
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT# 0171( <br /> BUILDING <br /> PLANNING <br /> Bldg/II/Add Rem;:ize Zoning Classification s <br /> Garage Size` Overlay/Agreement <br /> VALUATION ett ,00 Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group A Proposed No. of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No_ Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction 4 6 needed before final? Yes_ No_ <br /> Existing Sprinkler System? Yes_ No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes No Phone#: <br /> Reason Approved by: � Date: )t 36/17- <br /> Existing Fire Alarm Yes— No_Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes No_ School Mitigation Reqd? Yes_ No <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No_ #of Net New Units: <br /> Add!RCW 64.55 docs required prior to final?Yes_ No Calculated School Impact Fee: <br /> Architectural Approved By/Date: 444 /V/ School Impact Fee Credit: <br /> Structural Approved By/Date: Total School Impact Fee Owed: <br /> Comments: jet ,/�G Comments: <br /> Intake OK by: jk_ Intake OK by: Ok to route _ Hold _ <br /> Make this a"W" Permit? Yes_ No X) <br /> PUBLIC WORK. .. <br /> FEES INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: 6/ ,,./ �Q(�� dBuilding Permit t' IVY U r U I <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check ❑ Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. Fee 0 PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes_ No_ Existing Bldg._ <br /> Update/New Detection Yes No_ Existing Bldg._ <br /> Update/New Chemical Yes_ No_ Existing Bldg._ <br /> Update/New Fire Service Yes_ No_ Existing Bldg. <br /> e <br /> Approved by: Date: <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.