Laserfiche WebLink
10/2/2017 Michael Leachman P.E. Page <br /> 8/14 <br /> Design Build Services, Inc. <br /> Engineering and Construction Management <br /> 28119-120th St.S.E., Monroe,WA 98272 <br /> Phone/Fax(360)793-9659 <br /> C.)Shear Wall Loads,WIND <br /> C.2)Side Y-Y <br /> Distribution Factors Distribution <br /> Diaph. Between A [of] Pressure Load [lb] Yin Y(i+1)n Yin Y(i+1)n <br /> Y1 m-Y2m 66 13.9 917.4 0.85 0.15 780 138 <br /> 209 10.4 2173.6 0.35 0.65 761 1413 <br /> 26 4.3 111.8 0.10 0.90 11 101 <br /> Total <br /> ` 1552 1651 <br /> Y2m-Y3m 47 13.9 653.3 0.25 0.75 163 490 <br /> 92 5, 460.0 0.20 0.80 92 368 <br /> 52 10.4 540.8 0.80 0.20 433 108 <br /> 66 4.3 283.8 0.75 0.25' 213 71 <br /> Total 901 1037 <br /> Totals V, [lb.] Wall Lengths, [ft] v, [plf] Scheduled Shear Wall <br /> Ylm 1551.7 13.7 113.3 51-6 <br /> Y2m 2551.9 20.8 122.7 61-'6 <br /> Y3m 1037.1 Existing <br />