Laserfiche WebLink
Michael Leachman P.E. <br /> 13/14 <br /> Design Build Services, Inc. <br /> Engineering and Construction Management <br /> 28119-120th St.S.E.,Monroe,WA 98272 <br /> Phone/Fax(360)793-9659 <br /> F.) Hold Down Calculations <br /> Qci-Keith Addition <br /> Wind Seismic Wind Seismic <br /> Grid Line v, [plf] v, [plf] Grid Line v, [plf] v, [pit] <br /> X1m 74.8 59.6 Y1m 113.3 111.7 <br /> X2m 106.8 84.7 Y2m 122.7 112.1 <br /> X3m Existing, Y3m EXiStmg <br /> Second Floor Height 0.00 ft <br /> First Floor Height 8.10 ft <br /> Uplift Force Tables <br /> Grid Line Pw[Ib] Ps [Ib] <br /> X1m 605.6 482.5 Y1m 917.4 904.9 <br /> X2m 864.8 685.8 Y2m 993.8 907.9 <br /> X3m Existing Y3m Existing <br /> UnitShear<;150 plf No Hold DownsReq'd <br /> S—)/k' <br />