My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5106 S 3RD AVE 2019-05-23
>
Address Records
>
S 3RD AVE
>
5106
>
5106 S 3RD AVE 2019-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 8:56:16 AM
Creation date
5/23/2019 8:56:09 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5106
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT# <br /> BUILDING • PLANNING <br /> Bldg/TI/Addn/Rem Size Zoning Classification g" 2- <br /> Garage <br /> Garage Size Overlay/Agreement — <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use (44)(14C <br /> Occupancy Group A Proposed No.of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: 2- <br /> Basement . No Yes_ Fin / Unfin Landscape or Planning Inspection / <br /> Type of Construction �j needed before final? Yes No v <br /> Existing Sprinkler System? Yes_ No Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes_ No_ Phone#: <br /> Reason Approved Date: (Q <br /> Existing Fire Alarm Yes_ No_Unk_ Historic Approved by: —- Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes No \/ <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No_ #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes_ No Calculated School Impact Fee: <br /> Architectural Approved By/Date: .. School Impact Fee Credit: <br /> Structural Approved By/Date: , Total School Impact Fee Owed: <br /> Comments: �p/S ,<t. Comments: N C 11—. 49°-7 <br /> Intake OK by: Intake OK by: Ok to route _ Hold <br /> Make this a"W" Permit? Yes No <br /> PUBLIC-WORKS <br /> FEES ,', INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check 0 Public Works/Sys Dev/Traffic Mit./RPBA- NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee 0 PW Permit Approved-PW <br /> SewerFee 0 See PW Review Worksheet <br /> Systems Dev. Fee 0 PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee . FIRED!PARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes_ No_ Existing Bldg._ <br /> Update/New Detection Yes No_ Existing Bldg. <br /> Update/New Chemical Yes_ No_ Existing Bldg._ <br /> Update/New Fire Service Yes_ No_ Existing Bldg. <br /> Approved by: Date: <br /> Comments: ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.