My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10205 7TH AVE SE 2019-05-23
>
Address Records
>
7TH AVE SE
>
10205
>
10205 7TH AVE SE 2019-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:41:55 AM
Creation date
5/23/2019 10:41:54 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10205
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3?7r--1 <br /> C <br /> Residential Photovoltaic OTC Permit Application <br /> ear° <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project information <br /> Property Owner Name: Maksim&Lilya Sergiyeriko <br /> Project Address: 10205 7th Ave SE Parcel# 00482200000101 <br /> City: Everett State: WA ZIP: 98208 <br /> Day Phone: (425)319-2629 <br /> Contractor Name Smart Energy Today <br /> Contractor License#: SMARTET869BS <br /> contractor Day Phone: 360-339-6660 <br /> PV system description Installation of residential rooftop pv solar system 5.22kW with micro-inverters <br /> (include manufacturer containing automatic rapid shutdown. <br /> and model#of PV (18x) Itek Energy IT290-SE <br /> modules and (9x) Blue Frog Solar YC500A-MIW <br /> inverters): Spider-Rax Black Widow Composite <br /> ()Determine it your Project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that d <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by M 0 <br /> the local jurisdiction. <br /> 3, Rooftop is made from lightweight material such'as a single layer of composition shingles, I ' 0 <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302,2] L9i 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority HavingJurisdiction to lit 0 <br /> administer the electrical code.[IRC M2302.2] <br /> 5. The installation shall meet the requirements of the International Fire Code as amended o <br /> by WA State.[IRC M2302.2] <br /> 7, The PV system is designed for the wind speed of the local area,and will be installed per 0 <br /> the manufacturer's specifications.[IRC M2302,2,1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302.2.1(2)] IV 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per•square foot.[IRC M2302.2.1(3)] (a' ' 0 <br /> Enter total dead load of system(lbs/ft2): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of theSi ❑ <br /> roofing to which they are affixed,[IRC M2302.2.1(4)] <br />
The URL can be used to link to this page
Your browser does not support the video tag.