Laserfiche WebLink
PUBLICORKS PERMIT Date Applied: 10/15/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1810-039 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $65.00 <br /> 1 5 OCT 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> VU MUI VAN & LE LOAN T VU MUI VAN & LE LOAN T <br /> 8728 9TH AVE SE 8728 9TH AVE SE <br /> EVERETT, WA, 98208-2023 EVERETT, WA, 98208-2023 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00402500001800 SITE ADDRESS: 8728 9TH AVE SE <br /> • <br /> DESCRIPTION: PAVED PARKING AREA/DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 10/15/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construcii.Qn for ., <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally reciuestecee <br /> attached handout for phone number and online instructions to Request an Inspection. ~r-{ <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved S - Ftf move upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. ' <br /> 8. Protect all existing underground utilities during construction. ; <br /> �, rin c7 <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces=Niri.lt be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way ap /or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Ceti the inspection liriii to <br /> request a Final for this permit when all items have been completed. , 3E <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the own`& ise if the City ever <br /> requires use of the right-of-way for municipal purposes. : >8 i.%73 <br /> Cay i':7 <br /> Public Works Permit Fee Breakdown: w• <br /> Paving (726SF) $45.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> • j_— harmless the City of Everett from any and all claims for damages,costs, <br /> (�? �� expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for onstruction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> r <br /> FINAL INSPECTION Date (o! tali f <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO. <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> Jrt_4. W94 <br />