My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5002 9TH AVE W 2019-05-23
>
Address Records
>
9TH AVE W
>
5002
>
5002 9TH AVE W 2019-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 11:30:09 AM
Creation date
5/23/2019 11:30:07 AM
Metadata
Fields
Template:
Address Document
Street Name
9TH AVE W
Street Number
5002
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVER-THE-COUNTER ELECTRICAL PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist and use a template electrical diagram provided by the City or other approved diagram.All <br /> project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> Property Owner Name: Don Cowdrey <br /> Project Address: :5002 9th Ave w Parcel# <br /> City: Everett State:WA ZIP: 98203 <br /> Day Phone: (206)300-6903 <br /> Contractor Name A&R SOLAR <br /> Contractor License St. RSOLAR*903JM <br /> Contractor Day Phone: 206-707-9937 <br /> PV system description Installing a 6.9 kW Photovoltaic System on the roof. <br /> (include manufacturer (23) Itek Energy 300W <br /> and model#of PV (12) Blue Frog YC500A-MIW <br /> modules and <br /> inverters): <br /> ()Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,inverters,and combiner boxes are identified for use in PV systems. • 1 <br /> 2. The inverters are listed and labeled in accordance with UL 1741 and are listed for El <br /> ❑ <br /> utility interaction. [IRC M2302.4] <br /> 3. The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)] <br /> t <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code � El <br /> requirements. <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service 0 <br /> disconnects. <br /> 6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(D)(2)(3)(b),and is limited to(check combination that <br /> applies): <br /> 0225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> 0225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter OCPD. <br /> 8200 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter OCPD. <br /> 0150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> 0125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp inverter OCPD. <br /> 0125 amp bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.