My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 N BROADWAY IN N OUT MINI MARKET 2019-05-31
>
Address Records
>
N BROADWAY
>
902
>
IN N OUT MINI MARKET
>
902 N BROADWAY IN N OUT MINI MARKET 2019-05-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 2:31:24 PM
Creation date
5/28/2019 4:01:39 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
902
Tenant Name
IN N OUT MINI MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 11/27/2017 <br /> elp. City of Everett Permit Services Public Works Permit#: PW1711-030 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> 1011111111,--A <br /> Everett,WA 98201 * tanning Reference#: <br /> v//// _ - - <br /> (425)25T-88 o Public Works Fee: $460 <br /> a. <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NAP MANAGEMENT, Inc.- DAVE HUNTER KANE ENVIRONMENTAL- ERIC NASSAU <br /> 7525 SE 24TH ST P.O.BOX 31936 <br /> MERCER ISLAND, WA, 98040 SEATTLE, WA, 98103 <br /> PHONE: PHONE: 2066910476 <br /> TAX PARCEL ID#: 29051700201100 SITE ADDRESS: 902 N BROADWAY <br /> DESCRIPTION: DECOMMISSIONING AND REMOVAL OF THREE GAS STATION USTs <br /> (10/24/2017 2:56 PM BES) <br /> (10/24/2017 2:52 PM BES) <br /> DECOMMISSIONING AND REMOVAL OF THREE GAS STATION USTs, AND ASSOCIATEDPIPING, DISPENSERS AND <br /> DISPENSER CANOPY. THE PARKING LOT WILL REPAVED. A SOIL VAPOR EXTRACTION SYSTEM WILL BE <br /> INSTALLED TO REMIDIATE ON-SITE PETROLEUM CONTAMINATED SOIL AND GROUNDWATER. NO WORK IN THE <br /> RIGHT-OF-WAY. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 11/02/2017. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install temporary constuction entrance per City standards. <br /> 6. Install and maintain erosion control measures per City of Everett Standards. Remove upon completion of the project prior <br /> to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. If the prposed fill is intended to support structures in later date, the fill shall be placed in accordance with Appendix J of <br /> the international Building code. If the applicant does not intend to do that the applicant is required to submit a letter to the <br /> City stating so. The letter will be recorded against the property. <br /> 10. If discharge is necessary fill"Industrial Discharge Approval Request Form" prior to discharging. <br /> 11. All contaminated soil and excavated materials from the removal of the ground shall be hauled and deposited to an <br /> approved, permited site. <br /> 12. Obtain permit from fire department for tank removal. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control Pla ¢j ,(iJ /y...$200.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> Grade/t-ili/txcavate (5UU (;Y) $15U.UU The undersigned owner/applicant hereby agrees to hold and save <br /> Parking Lot Paving(14,000 SQFT) $70.00 harmless the City of Everett from any and all claims for damages,costs, <br /> PW Plan Review $20.00 expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> IOWA'IBP6Rikructiorr.(Public Works)$20.00 Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.