Laserfiche WebLink
POST -INSTALLED ANCHORS REPORT <br />MAYES TESTING ENGINEERS <br />Report Number: M7181633.0003 <br />Service Date: 07/17/18 <br />Report Date: 07/25/18 <br />Client <br />Stone & Wind, LLC <br />Attn: Luke Shamp <br />12125 Cyrus Way <br />Mukilteo, WA 98275 <br />Permit No.: CW-1612-003 <br />Samples: N/A <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Cliff Drive Flip <br />4110 Cliff Drive <br />Everett, WA <br />Project No.: M7181633 <br />Weather: Clear <br />On site for inspection of hold-down installation. Per report service date 07/16/18, contractor installed missing <br />HDU8 at grid lines 1/13, and HDU2 at grid lines 4/bg.2. This closed report service date 07/16/18. The epoxy used <br />was Simpson XP (expiration 01/12/20). <br />CORRECTIVE ACTION TAKEN <br />Preliminary report, service date 07/16/18, is closed. <br />To the best of our knowledge, the items inspected today are in conformance with approved plans and <br />specifications. <br />Services: Special Inspections / Materials Testing <br />Mayes/Terracon Rep.: David Schmutzle.r <br />Reported to: Stone & Wind, LLC <br />Contractor: Stone & Wind, LLC <br />Report Distribution: <br />(1) stone & Wind, LLC, Luke Shamp (1) City of Everett WA, Dave Foster <br />(1) Mayes Testing Engineers, Inc, Bob Reviewed By: <br />Gardner <br />Ti iothy G. Beckerle, PE <br />Principal <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client <br />indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br />the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />CT0001, 10-16-13, Rev.10 Page 1 of 1 . <br />