My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4110 CLIFF DR 2022-01-26
>
Address Records
>
CLIFF DR
>
4110
>
4110 CLIFF DR 2022-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 2:08:13 PM
Creation date
5/29/2019 8:07:19 AM
Metadata
Fields
Template:
Address Document
Street Name
CLIFF DR
Street Number
4110
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. SWPPP NARRATIVE <br />The intent of this section is to provide the information necessary to support the <br />engineering plans in order to implement a design that will; reduce, eliminate or prevent the <br />discharge of stormwater pollutants, meet or exceed the water quality and sediment <br />management standards for the City and State, and prevent adverse impacts to the <br />receiving waters for this project. Note; this narrative is intended to support the SWPPP <br />that is included with the Targeted Drainage Plans also a part of this submittal package to <br />the City. <br />A. SITE GRADING/EROSION- CONTROL RISK ASSESSMENT <br />Area proposed to be cleared/worked: . <br />Average slope for the short plat: <br />Erosion Hazard of Soil <br />Critical Areas downslope <br />Site is upstream of an ESA Stream <br />0.38 acres <br />22% (Area of Disturbance Only) <br />Low <br />No <br />Yes <br />Based on the above information and the fact that the area of the short plat to be disturbed <br />is moderate to steep and construction site runoff will pass through silt fencing or other <br />perimeter filtration features prior to leaving the short plat, and that if site conditions <br />warrant, additional BMP's can be implemented as corrective measures the Risk Category <br />for this site is Low Risk. <br />B. SWPPP MINIMUM ELEMENTS <br />1: Preserve Vegetation and Mark Clearing Limits <br />The first step in the construction process is for the contractor to fence the limits of <br />clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br />plans locate and provide the square footages for the areas of grading, clearing, impervious <br />surfaces and un-disturbed areas on the proposed short plat. As much of the natural <br />vegetation as possible will be preserved on this project (BMP C101). Approximately 100% <br />of the short plat will be cleared or disturbed for this project. <br />2: Establish Construction Access <br />The SWPPP calls for the proposed construction entrance (BMP C105) to be installed as <br />the second step after the staking of clearing limits. Since this project will utilize the <br />existing site access on the property this feature will not require any excessive grading to <br />install, will be available immediately and may require some maintenance to ensure proper <br />function during the site work. At this time winter work is expected during the wet season. <br />3: Control Flow Rates <br />This project is below the thresholds requiring flow control for the project. <br />Reid SP 15-0714 <br />July 2017 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.