Laserfiche WebLink
} associated Exploration Log <br /> earth sciences Project Number Exploration Number Sheet <br /> o o r ° ' ° d 160594V001 GP-18 1 of 1 <br /> Project Name Brien Ford Everett Ground Surface Elevation(ft) 343 (approx) <br /> Location Everett, WA Datum N/A <br /> Driller/Equipment Cascade/Geoprobe- Dolly Mount Rig Date Start/Finish 2/13/17 2/13/17 <br /> Hammer Weight/Drop N/A Hole Diameter(in) 2 inches <br /> fA U 4 O > fo <br /> a' � N rn <br /> , Blows/Foot <br /> m S E `� T E o <br /> T ° DESCRIPTION " m 10 20 30 40 ° <br /> Concrete-4 inches <br /> Fill/Reworked Native Soils <br /> Loose,wet(overstated),brownish gray,very silty,fine SAND,trace fine to <br /> S-1 coarse gravel(SM). <br /> Becomes medium dense,slightly moist,dark gray(staining),silty,fine to <br /> medium SAND,some fine to coarse gravel;staining,strong odor(SM). <br /> PID=196 ppm <br /> Loose to medium dense,slightly moist to moist,dark gray(staining),silty, <br /> fine to medium SAND,trace to some fine to coarse gravel;staining,strong <br /> S-2 • odor(SM). PID=345 ppm <br /> Refusal at 5 feet;becomes medium dense. PID=371 ppm <br /> — 5 <br /> Bottom of exploration boring at 5 feet <br /> Refusal at 5 feet. No ground water encountered. <br /> — 10 <br /> — 15 <br /> — 20 • <br /> a <br /> N_ <br /> Di <br /> N <br /> l0- <br /> a <br /> Sampler Type(ST): <br /> _ 2"OD Split Spoon Sampler(SPT) No Recovery M-Moisture Logged by: KMA <br /> ® 3"OD Split Spoon Sampler(D&M) 11 Ring Sample .V Water Level() Approved by: OKP <br /> Grab Sample Z Shelby Tube Sample Z Water Level at time of drilling(ATD) <br />