Laserfiche WebLink
> associated Exploration Log <br /> earth sciences Project Number Exploration Number Sheet <br /> dojo ° r 160594V001 GP-29 1 of 1 <br /> Project Name Brien Ford Everett Ground Surface Elevation(ft) 343 (approx) <br /> Location Everett, WA Datum N/A <br /> Driller/Equipment Cascade/Geoprobe- Dolly Mount Rig Date Start/Finish 3/9/17,3/9/17 <br /> Hammer Weight/Drop N/A Hole Diameter(in) _2 inches <br /> c a) u, <br /> u, U7, O > fD C/) <br /> °' E L 1 N Blows/Foot F- <br /> S N >� �E .�.. O <br /> T ° c. <br /> DESCRIPTION " m 10 20 30 40 ° <br /> 9 °a Concrete-6 inches <br /> Fill I Reworked Native Soils <br /> Loose to medium dense,slightly moist, brownish gray,silty,fine to coarse <br /> S-1 SAND,some fine to coarse gravel;unsorted(SM). <br /> GP-29:2 <br /> Vashon Ice-Contact <br /> Medium dense,slightly moist,brownish gray,silty,fine to medium SAND, s <br /> S-2 some fine to coarse gravel;no staining,no odor(SM). <br /> GP-29:5 <br /> — 5 <br /> Bottom of exploration boring at 5 feet <br /> Refusal at 5 feet. No ground water encountered. <br /> — 10 <br /> — 15 <br /> — 20 <br /> n <br /> 0 <br /> N_ <br /> 6- <br /> L <br /> U <br /> t0- <br /> a <br /> Eg C7 <br /> Sampler Type(ST): <br /> _ 2"OD Split Spoon Sampler(SPT) No Recovery M-Moisture Logged by: KMA <br /> o ® 3"OD Split Spoon Sampler(D&M) 11 Ring Sample SZ Water Level 0 Approved by: OKP <br /> w f$ Grab Sample = Shelby Tube Sample 1 Water Level at time of drilling(ATD) <br />