Laserfiche WebLink
Building Permit Plans Checklist, pg. 3 ENV-CHK <br /> 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 <br /> Project Title: Enhanced Servicess Facility (ESE) + Retail Date <br /> Applicability Code Location in Building <br /> (yes,no,na) Section Component Compliance information required in permit documents Documents Department Notes <br /> In single story buildings,provide list of enclosed areas that exceed 2,500 sf, <br /> have ceiling height greater than 15 ft,and are space types required to <br /> comply with this provision.For each area identify space type,floor area, <br /> floor to ceiling height,and any exception taken; <br /> Spaces in single For each area provide calculations for percentage of conditioned floor area <br /> na C402.4.2 story buildings located within a daylight zone including skylight and eligible sidelight <br /> requiring skylights daylight zones; <br /> For each area provide calculations for percentage of skylight area,OR; <br /> Provide calculations for skylight effective aperture(Equation C4-5); <br /> Indicate haze factor of skylight glazing material or diffuser <br /> AIR LEAKAGE <br /> Air barrier Indicate location of continuous air barrier on plans and sections; <br /> yes C402.5.1.1 construction and Provide details for all joints,transitions in materials,penetrations in air A006,WP105, <br /> sealing barrier and note method of sealing(caulked,gasketed,or other approved WP106,WP107, <br /> method) 14/A615,15/A615 <br /> Rooms containing Indicate that room(s)containing non-direct vent appliances is isolated from <br /> open combustion fuel inside the thermal envelope with a sealed air barrier, including doorway <br /> na C402.5.3 burning appliances gasketing and sealing around ductwork and piping penetrations; <br /> used for space Indicate insulation provided in wall,floor and ceiling of the room envelope, <br /> conditioning and insulation required on combustion air ductwork <br /> Access openings and Indicate locations of all access openings and doors to shafts,chutes, A201,A203,A211, <br /> yes C402.5.4 doors to shafts, stairways and elevators; A213; <br /> chutes,stairways and Indicate method of gasketing,weatherstripping and sealing of these Specifications <br /> doors openings 08100.2.12 <br /> Indicate locations of all stairway enclosure,elevator shaft and building <br /> C402.5.5 Outdoor air intakes, pressurization relief openings,outside air intakes and exhaust openings; A201,A203,A211, <br /> yes exhausts and relief Note in envelope plans that all relief,outside air intake and exhaust A213;A006; <br /> C403.2.4.3 <br /> openings openings shall be provided with dampers in accordance with Mechanical M201,M203, <br /> Section C403.2.4.3 M205 <br /> Indicate method of sealing between light fixture housing and wall or ceiling; See Details <br /> Recessed lighting in 14/A615,15/A615. <br /> yes C402.5.8 Note in envelope plans that all recessed lighting fixtures shall be IC rated Lighting Fixture <br /> building envelope <br /> and have an air leakage rating not greater than 2 cfm per ASTM E283 test; Schedules E <br /> include these requirements in lighting fixture schedules sheets. <br /> na C402.5.6 Loading dock seals Indicate weather seal at cargo and loading dock doors <br /> Indicate locations and dimensions of vestibules and air curtains; A201,A203 <br /> Indicate exception and criteria utilized for all building entrances and exits Vestibule N/A per <br /> 2.5.T <br /> C402.5.7 Vestibules that do not have a vestibule or air curtain; <br /> C40 <br /> yesException 4 for <br /> Indicate required performance for air curtains installed per exception 7; Retail and <br /> For unconditioned vestibules,indicate which envelope assembly(interior or Exception 8 for all <br /> exterior)complies with the requirements for a conditioned space other areas. <br /> Indicate on plans the air barrier boundaries and area calculations on all six <br /> sides of the air barrier; <br /> Indicate air barrier test method in accordance with ASTM E779 or approved <br /> equivalent; <br /> yes <br /> C103.2 Building air leakage Indicate required maximum leakage rate for compliance. <br /> C402.5.1.2 test Include the following requirements in project documents:(1)Submit air <br /> barrier test report to jurisdiction once test is completed;(2)If test results <br /> exceed 0.4 cfm/ft2 at 0.3 in.wg,then visually inspect air barrier and seal <br /> noted sources of leakage;(3)Submit a follow-up report to jurisdiction noting <br /> corrective measures taken; (4)Include air barrier test report in compliance A006,A601,A603, <br /> documentation provided to owner. A605 <br /> If"no"is selected for any question, provide explanation: <br /> End of Building Permit Plans Checklist <br />