Laserfiche WebLink
741 Marine Drive,Bellingham, WA 98225 www.geotest-inc.com <br /> es" CSG OTG ST 20611 67th Ave.NE.Unit A.Arlington,WA 98223 <br /> phone:(360)733.7318 toll free:(888)251.5276 fax:(360)733.7418 <br /> LATERAL FRAMING INSPECTION REPORT <br /> I PROJECT: Enhanced Services Facilities(ESF)and Retail JOB#: 18-0006 <br /> CLIENT: JT Madison, Inc. REPORT#: LF005 <br /> CONTRACTOR: Constantine Builders,Inc. PAGE#: (1(7-)1D <br /> This is a picture of the typical PHD2A holdown installed. <br /> The holdown was manufactured by USP <br /> GeoTest compiled a punch list of items which will need to <br /> .be addressed prior to covering. <br /> Items include the following. <br /> 1) SW2 Shear Wall has 2x studs at the sheathing edges <br /> where 3x studs or double 2x are called for. <br /> 2) Missing nails attaching the sheathing to the framing <br /> 3)Two anchor bolts missing at 2 locations, S and N walls <br /> 4) One holdown in the wrong location <br /> 5) Full height holdown posts stopping at the bottom of <br /> window headers at a few location <br /> '6) Incomplete nailing of framing at building's NW corner <br /> 7)A35 clip installation is in progress <br /> The contractor plans to have us return for a final <br /> inspection next week <br /> 1 <br />