My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
>
Address Records
>
EVERGREEN WAY
>
6502
>
ENHANCED SERVICE FACILITIES
>
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 9:13:55 AM
Creation date
5/29/2019 3:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Tenant Name
ENHANCED SERVICE FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tom Bartlett <br /> From: <br /> David Stubbs <mdstubbs@psm-engineers.com> <br /> Sent: Wednesday,April 11,2018 4:47 PM <br /> To: Mindie Goodrich;Steven Barnes; Marc Jenefsky(mjenefsky. -•merstonearch.com); <br /> Tom Bartlett <br /> Cc: Becky Braaten;toddmadison@hotmail.com; Michael R..ek;David Stubbs <br /> Subject: RE:Structural Field Fixes from •.. <br /> Ladies and Gents- 8/ 43 " ef/y <br /> I meant to add: Regarding interior walls whic are searing walls but not shear walls. OK to attach wall plate to <br /> concrete deck with shot pins at 16"oc instead of anchor bolts. <br /> Obviously at shear walls and exterior walls use anchor bolts as before. <br /> Thanks, <br /> M. David Stubbs, PE,SE <br /> Peterson Strehle Martinson, Inc. <br /> 2200-6th Ave Suite 601 <br /> Seattle WA 98121 <br /> DIRECT 206-239-7712 <br /> 206-622-4580 Ext 131 <br /> mdstubbs@psm-engineers.com <br /> From: David Stubbs <br /> Sent: Wednesday,April 11, 2018 3:37 PM <br /> To: Mindie Goodrich; Steven Barnes; Marc Jenefsky(mjenefsky@cornerstonearch.com);Tom Bartlett <br /> Cc: Becky Braaten; toddmadison@hotmail.com; Michael Panek; David Stubbs <br /> Subject: ESF: Structural Field Fixes from Monday <br /> Ladies and Gerrts- <br /> Attached drawings reflect field fixes per site visit Monday(I am taking the liberty of sending direct to Constantine as <br /> I don't believe these have any coordination angle): <br /> S201,S202:added 6x6 post and HDU11 to ground near grid E/7 as part of fix for hold-down bolt which interferes <br /> with window. <br /> S203:added 6x6 post to ground near grid E/7,added callouts at two locations where we had shown tube columns, <br /> and revised callouts at low roof as discussed on-site. <br /> S204:Added/revised callouts at two locations where we had shown tube columns. <br /> 5601: Details 1,2, 3,4 revised or added, low roof connections. Sorry but these are not revised per today's <br /> conversations about beam height. <br /> S603: Details 2 and 3 added for locations where we had shown those two tube columns,detail 4 added for E/7. <br /> Tom,on-site you or Kevin had questioned the Simpson LGT hold-downs from the main trusses to the columns and <br /> beams. Below is a picture of a Simpson LGT, I think these will work. (On my phone I had pulled up a picture of a <br /> VGT which will not work.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.