Laserfiche WebLink
PUBLIC WORKS PERMIT pate Applied: 5/12/2017 <br /> City of Everett Permit Services Public Works Permit#: PW1705-024 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: SEPA16-021 <br /> vir -141411 _Wjr - <br /> (425)257-8810 Public Works Fee: $0 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MADISON REAL PROPERTY LLC MADISON TODD <br /> PO BOX 31609 F <br /> SEATTLE, WA, 98103 <br /> PHONE: PHONE: 2066195555 <br /> TAX PARCEL ID#: 00393000001500 SITE ADDRESS: 6502 EVERGREEN WAY <br /> DESCRIPTION: SITE WORK FOR NEW MIXED USE RETAIL& ESF <br /> Civil Site work for Mixed Retail/Commercial &Assisted Living Facility to include grading, paving, utilities, stormwater, and <br /> frontage improvements. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated <br /> 10/23/2017. Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction to set up a <br /> pre-construction consultation. All inspections must be formally requested. See the attached handout for phone number and <br /> online instructions to formally request an inspection. <br /> 6. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. <br /> Work for each connection to be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost <br /> estimate by the Water Department.Work shall be scheduled 3-4 weeks in advance(425-257-8827). <br /> 7.As-builts of storm, sanitary sewer, and water systems are required to be submitted to the PW Inspector per City Design <br /> and Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8. A Public Access Easement for the back 1.5ft of the sidewalk along Fleming Street is required. The easement <br /> documentation will be submitted to the City prior to issuance of permits and must be recorded by the project team with a <br /> copy of the recorded document submitted to the City prior to final approval/close out of the permit. <br /> 9. A 1-year Warranty Bond in the amount of 10% of the construction costs for all public improvements shall be submitted to <br /> the City prior to final approval/close out of the permit. <br /> 10. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stormwater Infrastructure shall be <br /> submitted to the City prior to final approval/close out of the permit. <br /> 11. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contact the. <br /> Planning Department at 425-257-2273 to schedule the inspection. If this requirement cannot be met, discussthe option of <br /> posting a landsaping bond with the Planning Department. <br /> 12. The above conditions must be met prior to issuance of a Temporary Certificate of Occupancy. No deviations will be <br /> permitted. <br /> 13. This permit mug/043f4*#ikosppkArbgpse out this permit/grant a Certificateokiceamqbp0ftelp9,gionline to <br /> request a Final for this permit when all items have been•completedrhe undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> Public Works Permit Fee Breakdown: expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> CI0510o � uctinrrt PublrcVtlors Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> Grade/Fill/Excavate(XXXCY) ...$XXX.XX <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />