My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
>
Address Records
>
EVERGREEN WAY
>
6502
>
ENHANCED SERVICE FACILITIES
>
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 9:13:55 AM
Creation date
5/29/2019 3:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Tenant Name
ENHANCED SERVICE FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uri if <br /> PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street MAILED <br /> tv Everett WA 98201 <br /> 425-257-8800 NOV 0 1 2017 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> Cost of Work Order - Work Order# <br /> X Cost of Service Order $6272.00 Service Order# <br /> Contact Person Todd Madison Telephone# 206 619-5555 <br /> Requested By Sabrina Fandler Date of Request = 9-28-2017 <br /> Property Owner(name) Madison Real Property LLC <br /> Charge Cost to(name if different than owner) <br /> Address PO Box 31609 City Seattle, WA Zip 98103 <br /> Installation Location 6502 Evergreen Way <br /> Installation type/description/size/etc. Tap existing 6" D.l. with 4 inch, cross Fleming and connect <br /> to contractor installed.4 inch Di. pipe with 4" DCDA in vault. C.O.E. will excavate, shore, restore <br /> and provide traffic control for street crossing. C.O.E. will cold patch street crossing contractor will <br /> maintain patch and asphalt later. Service size: 4" Service type: Fire <br /> I The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $2066.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $2856.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $1050.00 Paul McKee <br /> Tax $300.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $6272.00 Benyam Stephanos <br /> Prepared by: Jim Spooner . Date Estimate Prepared 10/31/2017 <br /> Accepted by: <br /> "�;:�' Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\6502 Evergreen Way Fire Svc 4 CEFP <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.