My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
>
Address Records
>
EVERGREEN WAY
>
6502
>
ENHANCED SERVICE FACILITIES
>
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 9:13:55 AM
Creation date
5/29/2019 3:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Tenant Name
ENHANCED SERVICE FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 5/12/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1705-024 <br /> 3200 Cedar Street Parent Permit#: <br /> PlanningReference#: SEPA16-021 <br /> Everett,WA 98201 <br /> (425) 257-8810 Public Works Fee: $2,729.77 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MADISON REAL PROPERTY LLC MADISON TODD <br /> PO BOX 31609 <br /> SEATTLE,WA,98103 <br /> PHONE: PHONE: 2066195555 <br /> TAX PARCEL ID#: 00393000001500 SITE ADDRESS: 6502 EVERGREEN WAY <br /> DESCRIPTION: SITE WORK FOR NEW MIXED USE RETAIL& ESF <br /> Civil Site work for Mixed Retail/Commercial &Assisted Living Facility to include grading, paving, utilities, stormwater, and <br /> frontage improvements. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 10/23/2017. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction to set up a pre- <br /> construction consultation.All inspections must be formally requested. See the attached handout for phone number and online instructions <br /> to formally request an inspection. <br /> 6. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.Work for each <br /> connection to be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water <br /> Department.Work shall be scheduled 3-4 weeks in advance(425-257-8827). <br /> 7.As-builts of storm,sanitary sewer, and water systems are required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8.A Public Access Easement for the back 1.5ft of the sidewalk along Fleming Street is required. The easement documentation will be <br /> submitted to the City prior to issuance of permits and must be recorded by the project team with a copy of the recorded document <br /> submitted to the City prior to final approval/close out of the permit. <br /> 9. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior <br /> to final approval/close out of the permit. <br /> 10.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contact the Planning <br /> Department at 425-257-2273 to schedule the inspection. If this requirement cannot be met, discuss the option of posting a landscaping <br /> bond with the Planning Department. <br /> 12.The above conditions must be met prior to issuance of a Temporary Certificate of Occupancy. No deviations will be permitted. <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspection line to r est ' al <br /> for this permit when all items have been completed. Q -y <br /> Public Works Permit Fee Breakdown: J <br /> Paving (12,635SF) $63.18 <br /> Erosion Control $200.00 OCT 2 4 2017 <br /> Grade/Fill/Excavate (1638CY) $245.00 <br /> PW Plan Review $740.53 g 'ETT <br /> PW Site Inspection $1,481.06 ACKNOWLEDGE yp'� �r, �ol, <br /> The undersigned owner/applicant hereb .-o. . tf save <br /> Ci of Everett Official Use Only harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> !©/i�� �/2 maintenance of the impr..-ment or other right-of-way use here to applied <br /> oc l , for and further as -- J9'emove same upon notice from the City and to <br /> Approved for Construction(Public Works) Date replace pus .ropyy.-ma led thereby. <br /> FINAL INSPECTION Date �� 7e Y1. <br /> Approved as Constructed(PW Inspector) Sig.�ture of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.