Laserfiche WebLink
PUBLIC WORK <br /> Item Unit Quantity . Unit Price Amount <br /> Construction Storm Drainage <br /> Temporary - L.F. 5.00 <br /> OtherGrading for drainage swales L.F. 2.00 <br /> Other <br /> Construction Storm Drainage Total $ <br /> Clearing &Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. 2,111C 12.00 1 ?. z, <br /> Total grading/cut/fill C.Y, Q See EMC <br /> (total earth moved) 13.80.010 <br /> ONcor N.1E `j <br /> Clearing and Grading Total: $ ZZ-, 6,c, ____ <br /> �15/' <br />