My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
>
Address Records
>
EVERGREEN WAY
>
6502
>
ENHANCED SERVICE FACILITIES
>
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 9:13:55 AM
Creation date
5/29/2019 3:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Tenant Name
ENHANCED SERVICE FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. t <br /> 7". PUBLIC WORKS <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter. Likewise, comments below may not have <br /> associated redlines. <br /> c. Sheet C-5: See redlines for water system. <br /> d. Sheet C-7: See redlines. Retaining walls 4ft or greater need structural calculations. Turn <br /> in 2 copies of structural calculations with your resubmittal. The retaining walls will be <br /> part of the public works permit but will be routed for review by the City's Structural <br /> Reviewer. Contact the City's Structural Reviewer, James Bronder (425-257-7287 or <br /> JBronder(a,everettwa.gov) with any questions regarding requirements for <br /> calculations/wall details. <br /> e. Sheet C-9: See redlines for asphalt ramp transitions. <br /> f. Sheet C-10: See redlines for parking lot/garage. Update location of truncated domes for <br /> pedestrian crossings. Update parking stall configuration to comply with code max of <br /> 15% allowable compact stalls. <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments, please contact Erik Emerson with the City of Everett <br /> Surface Water Department(425-257-8995 or EEmerson@everettwa.gov). <br /> a. Storm Drainage Report Comments: <br /> 1. Section 1, Figure 1 notes that the storage facility is for treatment only. The table <br /> should be revised to note the ChamberMaxx system and list the storage volume. <br /> 2. Section 2 contains threshold determination flow charts as requested. However, the <br /> flow charts used are from the old(2010) City of Everett stormwater manual. Please <br /> replace them with the flow charts from the 2014 Ecology manual as adopted by the <br /> City. <br /> 3. The Figure `Basin area for Filterra calculations" incorrectly lists the acreage for <br /> sidewalks and asphalt. The square footage values appear to be correct and the <br /> Filterra sizing appears to have been taken from the square footage values. Please <br /> check the conversion to acres and revise the summary table accordingly. <br /> 4. The detention calculations result in an orifice size of 0.384 inches. However, City <br /> standards require a minimum orifice size 0.5". Please refer to SWMM Volume 3 <br /> Section 3.2.4 for rules for upsizing the orifice to the minimum diameter. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.