Laserfiche WebLink
PUBLIC WORK <br /> I�en� i Unit Qraar�ti y U �# #�r�ce ° $ Amount <br /> Construction Storm Drainage <br /> Temporary Silt Fence L.F. 5.00 <br /> Grading for drainage swales L.F. 2.00 <br /> Other <br /> Other <br /> Construction Storm Drainage Total $ <br /> Clearing &Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. c g 12.00 C� <br /> Total grading/cut/fill C.Y. I go See EMC <br /> 13.80.010 <br /> (total earth moved) <br /> (nor ` <br /> Clearing and Grading Total: $ ' 6c. <br />