Laserfiche WebLink
Public Works Corrections Letter—Pressler Engineering's Responses to Mechanical and <br /> Electrical Comments <br /> (cont.) or contact the Everett Fire Department at(425) <br /> 257-8124.) All such tests shall be witnessed by a Fire <br /> Department inspector. Call (425) 257-8124 or (425) 257- <br /> 8120 to make an appointment for inspection. <br /> Contractors' materials and test certificates shall be <br /> submitted to the Everett Fire Department prior to issuance <br /> of any Certificates of Occupancy.2015 IFC,WA State <br /> Amendment 903.3.5.3, Page 111. <br /> Call (425) 257-8124 for more information. <br /> 15. The Snohomish County Emergency Radio System is PE Response: <br /> employed by the City of Everett Fire Department emergency Reference to the Emergency Radio <br /> crews and operates at 800 MHz. Large metal-framed or metal System is included in electrical <br /> and concrete buildings can weaken the signal so that specifications, but location shall be <br /> communication and, therefore, firefighter safety is coordinated by architect and fire <br /> compromised. This structure must meet the requirements of alarm contactor. <br /> EMC 16.03, Section 510, which specifically addresses <br /> required radio system performance standards in this structure. <br /> Your attention to this feature early in the planning stages <br /> will help avoid a costly, last-minute retroactive <br /> installation of radio signal amplification antennae and <br /> other equipment. For details, call the Everett Fire <br /> Department Plan Reviewer at (425) 257-8124. <br /> 19. All fire alarm control panels (FACP) and sprinkler valves. PE Response: <br /> shall be in heated rooms or closets with standard man door Concur. Sprinkler valves shall be <br /> access. Locations shall be approved by the Fire Code Official located in Room 028, which is <br /> (NFPA 13,2013 edition, section 8.16.4.1.3). heated, see sheet M201. FACP <br /> shall be located in Room 132, <br /> which is directly adjacent to heated <br /> space. <br /> 3) Site Lighting —Section 31 B.070.M. Site Lighting shall be PE Response: <br /> regulated per this section. Note: Provide a lighting plan. Lighting shown on Site Plan E101, <br /> E211, and E213. <br /> 1. I see some discrepancies on the plans such as: PE Response: <br /> A. an elevator but no elevator machine room or load for A. Elevator Machine Room is <br /> the elevator shown on sheet E201. Elevator <br /> load is included on Panel HP, <br /> sheet E501. <br /> B. Lighting loads have been added <br /> 111 B. no lighting loads to the panels on sheets E501 and <br /> E502. <br /> C. no loads for the ground floor C. Ground floor loads are shown <br /> on Panel HP Schedule, sheet <br /> E501. <br /> 31Page <br />