My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1127 GRAND AVE 2019-05-29
>
Address Records
>
GRAND AVE
>
1127
>
1127 GRAND AVE 2019-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 3:31:05 PM
Creation date
5/29/2019 3:31:03 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1127
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION FOR THE DEVELOPER <br /> Engineering/Permit Services Department Comments—Benyam Stephanos—425.257.7289: <br /> 1. Construction permits, inspections, and final approvals are required for this project from City <br /> of Everett Permit Services. <br /> 2: Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 3. It is the applicant/owner's responsibility to ensure that storm water runoff from new <br /> impervious surfaces will be managed on-site in a manner that does not adversely affect <br /> neighboring properties, including the City's Right-of-way. <br /> 4. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 5. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered <br /> with mulch as directed by the City Engineer. <br /> Planning Department,Long Range, Comments—Niels Tygesen—425.257.7168: <br /> 1. Project shall be required to comply with the Rucker/Grand Historic Overlay Zone Neighborhood <br /> Design Guidelines and Historic Overlay Zone Standards before building permit issuance. <br /> Planning Department Comments,Land Use—Kembra Landry—425.257.8808: <br /> 1. If a complete application has not been filed for a building permit or equivalent construction <br /> permit within eighteen (18) months from the approval date of this decision, the permit shall be <br /> deemed terminated, unless an extension is granted. If the permittee requests an extension in <br /> writing not later than eighteen (18) months from the land use permit date, the Director may grant <br /> a six (6)month extension. <br /> 2. This is an administrative decision that may be appealed to the City's Land Use Hearing Examiner. <br /> An appeal must be filed with the City within 14 days of the date of this notice. If you have <br /> questions regarding this proposal or if you wish to file an appeal, please contact Kembra Landry, <br /> City of Everett Planning Department, at 425.257.8731 or 8808. <br /> 2 of 2 <br /> REV II 16-007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.