My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE PAGODA VILLAGE 2025-07-28
>
Address Records
>
GRAND AVE
>
2900
>
PAGODA VILLAGE
>
2900 GRAND AVE PAGODA VILLAGE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 8:56:50 AM
Creation date
5/30/2019 7:21:35 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
PAGODA VILLAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
515
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Materials Testing & Consulting, Inc. ihignmg <br /> Geotechnical Engineering&Consulting•Special Inspection•Materials Testing•Environmental Consulting £ 6,0 <br /> ' + ,sc«OO. <br /> May 21, 2015 <br /> Mr. Joe Zlab <br /> Path America Farmers Market,LP <br /> PO Box 13261 <br /> Everett, WA 98206 <br /> Sent via email: joe@pathamerica.com <br /> Re: Final Letter <br /> Pagoda Village <br /> Grand and Wall Street Everett, WA <br /> MTC Project#13B 148 <br /> Building Permit#B1306-035 <br /> Mr. Zlab: <br /> Materials Testing& Consulting, Inc. (MTC)provided materials testing and special inspection services <br /> during construction of the above-referenced project. This letter is a statement declaring the actual work <br /> inspected by MTC itemized below was found to be,to the best of the inspector's knowledge, in accordance <br /> with project plans, specifications, engineer approved revisions, and the International Building Code. <br /> The following is the scope of inspections performed on this project. <br /> • Reinforced Concrete • Structural Steel <br /> • Reinforced Masonry • Post-Tensioning <br /> • Fireproofing • Shotcrete <br /> ♦ Lateral Wood • Proprietary Anchors <br /> In addition, Moisture-Density Relationship testing and In-Place Densities by Nuclear Method testing were <br /> conducted. MTC found the earthwork inspected to be in accordance with project plans, specifications, and <br /> engineer revisions or approval.-MT C accepts responsibility only for the specific work we inspected, and <br /> where an MTC report was generated. <br /> Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 <br /> SW Region • 2118 Black Lake Blvd. S.W.• Olympia, WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 <br /> NW Region • 805 Dupont St, Suite 5 • Bellingham, WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 <br /> Kitsap Region • 5451 N.W. Newberry Hill Road, Suite 101 • Silverdale, WA 98383 • Phone 360.698.6787 • Fax 360.692.1919 <br /> Visit our website: www.mtc-inc.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.