Laserfiche WebLink
Steve Miller <br /> From: Steve Miller <br /> Sent: Friday, March 28, 2014 1:39 PM <br /> To: 'Paul Richards' <br /> Subject: RE: Pagoda Village Farmers Market - External Vertical grease duct runs <br /> Thank You, Paul <br /> We believe the attached detail complies fully with the IMC and IBC. <br /> From: Paul Richards [mailto:prichards@ istudio19architects.com] <br /> Sent: Friday, March 28, 2014 11:20 AM <br /> To: Steve Miller <br /> Cc: Gary Womack; Adam Bowhay <br /> Subject: Re: Pagoda Village Farmers Market- External Vertical grease duct runs <br /> Hi Steve,thanks for returning my call this morning. <br /> Attached is the sketch you approved in our phone conversation ACS 059 R3 dated 3/24/2014 <br /> Please confirm this correct <br /> Thank you <br /> paul richards <br /> architect,Iced ap bd+c <br /> senior project manager <br /> studiel9 architects 705 2nd Ave, Suite 505,Seattle,WA 98104 <br /> Phone:206 466 1225 Fax:206 299 9107 I www.studiol9architects.com <br /> On Tue, Mar 25, 2014 at 9:49 AM, Paul Richards <prichards@studiol9architects.com>wrote: <br /> Hi Steve; <br /> I thought I was able to put this to bed after our last round with this design. The owner wanted to not use a <br /> double wall grease duct to save a load of money to put into other parts of the project. <br /> As we discussed we have 3 locations where we have vertical grease ducts that have runs along the vertical face <br /> of the building to fans to the roof <br /> The ownership wants to see these hidden behind a screening device. <br /> To the north we have a cluster of 4 ducts, and to the south we have a cluster of 3. Along alley we have proposed <br /> 2. <br /> We have developed revised typical sketch based on the appropriate code sections <br /> I <br /> 1 <br />