Laserfiche WebLink
PUBLIC ORKS PERMIT =ateApplied: 11/6/2018 <br /> 00w City of Everett Permit Services Public Works Permit#: PW1811-010 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $45 <br /> 0 6 Nov 201x, <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BERTIAUX STEPHANIE BERTIAUX STEPHANIE <br /> 2502 HIGHLAND AVE 2502 HIGHLAND AVE <br /> EVERETT, WA, 98201 EVERETT,WA, 98201 <br /> PHONE: 4252593523 PHONE: 4252593523 <br /> TAX PARCEL ID#: 00515657801700 SITE ADDRESS: 2502 HIGHLAND ST <br /> DESCRIPTION: FENCE IN RIGHT-OF-WAY <br /> This fence will be a concrete fence installed by the company: Fence For Life. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. The fence shall be no greater than 6 feet in height on the rear and side yards. <br /> 5. The fence shall be no greater than 42 inches in height in the front yard (shortest property frontage, unless otherwise <br /> noted or previously determined). <br /> 6. Fence shall be no greater than 36 inches in height within the 15ft sight triangles at the intersection of the roadway and <br /> the alley/intersecting roadway. <br /> 7. Protect all existing underground utilities during construction. Fence posts shall be at least 2ft away from any underground <br /> utility. <br /> 8. Contact the City of Everett Inspection line to final your permit or speak with the public works inspector. 425-257-8881. <br /> 9. This fence constructed within the public right-of-way must be removed or relocated at the owner's expense if the City <br /> ever requires use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: NOVence in R.O.W. $25.00 <br /> PW Site Inspection $20.00 <br /> NO - 62018 <br /> CITPeY®� <br /> rmit SeERET7' <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / r The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> Aro / kil 6 t7 -,,� expenses,or causes of action that may arise because of installation and <br /> ' �!S maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Pu•lic Works) to for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date % - 'l-� 11/ <br /> Approved as Constructed (PW Inspector) Sig ture of Applicant Dat <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />