My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7380
>
Resolutions
>
Resolution 7380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 9:20:53 AM
Creation date
5/30/2019 9:20:32 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7380
Date
5/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/6/2019 <br /> Construction <br /> www.Co m bi ned Co n stru cti o n l nc.co m <br /> 3701 South Road <br /> Mukilteo, WA 98275 <br /> 425-610-4334 <br /> COMBICI893NT <br /> 1832 Chestnut St, Everett, WA 98201 <br /> City of Everett Police Department <br /> Bid Item Estimated Total Bid <br /> Description Quantity Price Per Unit Amount <br /> 1.0 Labor(WA Prevailing Wage) 24 $75.00 $1,800.00 <br /> (3 Laborers,1 full day each) <br /> 2.0 Materials LS $1,150.00 $1,150.00 <br /> (Complete) <br /> NOTE:for employee safety,we specifically exclude the <br /> handling of bio-hazardous material <br /> TOTAL $2,950.00 <br /> Notes: <br /> The pricing contained herein is dependent on all work items listed being performed by Combined Construction,Inc. <br /> Any additions/deletions of work items or quantities could result in amended pricing.All above quantities are <br /> approximated based on information given at time of bid.All final payments will be based on field measurements. <br /> The insurance coverage included in this proposal is the Master Pak Endorsement"CG 84 12 03"any additional <br /> endorsements will be provided at additional cost.Combined Construction,Inc.is not signatory to organized labor. <br /> Exclusions: <br /> Hazardous Material Abatement,Access,Waste Disposal,Excavation,Falsework,Shoring,Sub-Grade,Layout, <br /> Embeds,Asphalt Removal,Concrete Washout,Traffic Control,Flagging,Barricades,Temporary Protection,Bonds, <br /> Permits,Material Testing,Flashing,Inspection Fees,Sales and Use Tax,and Engineering. <br /> Expiration: <br /> Combined Construction,Inc.reserves the right to withdraw this proposal If not accepted in writing within 30 days of <br /> bid due date.Acceptance of the prices contained herein constitutes agreement of all the terms and conditions <br /> in the above sections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.