Laserfiche WebLink
(7) CB 1905-29 — 2nd Reading — Adopt the proposed Ordinance creating a Special Improvement <br /> Project entitled, "Rucker Water Main Replacement Project." Fund 336, Program 002, to <br /> accumulate all costs for the improvement. (3rd and final reading on <br /> 5-29-19). <br /> (8) Award construction contract for the Downtown Streetscape Improvements Phase 2, Phase 3 <br /> and Rucker Water Main Replacement to Jansen, Inc. of Bellingham, WA, in the amount of <br /> $9,577,841.02. (Action on 5-29-19). <br /> (9) Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with <br /> Perteet, Inc. for the construction support services for Downtown Streetscape Improvements <br /> Phase 2 and Phase 3. (Action on 5-29-19). <br /> CONSENT ITEMS: <br /> (10) Adopt Resolution No. authorizing claims against the City of Everett in the amount of <br /> $2,261,286.40 for the period of May 4, 2019 through May 10, 2019. <br /> (11) Adopt Resolution No. authorizing electronic transfer claims against the City of Everett <br /> in the amount of $6,876,978.47 for the period of March 1, 2019 through March 31, 2019. <br /> (12) Authorize the Mayor to sign the Interlocal Cooperation Agreement for Implementation and <br /> Maintenance of the ORCA System. <br /> (13) Authorize Call for Bids for the Everpark Garage- Structural Repairs Project. <br /> (14) Authorize the Mayor to sign the Professional Services Agreement with Public Safety Testing <br /> Investigations for background investigations of Firefighter candidates in the approximate <br /> amount of $1,600. - $2,200. per candidate. <br /> (15) Authorize the Mayor to sign the Grant Agreement with Snohomish County Human Services <br /> in the amount of $23,000 to add fitness equipment at the Carl Gipson Senior Center. <br /> (16) Award Request for Proposal 2018-085 Protective Firefighting Ensemble to L.N. Curtis, MES, <br /> and Sea Western Inc. for a two-year contract with successive one-year renewals and an <br /> estimated annual cost of $110,000 including Washington State sales tax. <br /> (17) Authorize Call for Bids for the Diversion Dam Road Phase 3 Road Reconstruction and <br /> Haybecker Creek Culvert Replacement. <br /> (18) Authorize Request for Proposals #2019-035 Construction Equipment Cab Air Filtration <br /> System as substantially provided. <br /> (19) Authorize Call for Bids for the South Precinct Roof Replacement Project. <br /> (20) Authorize the Mayor to sign the Agreement with the Mountaineers to provide a workshop to <br /> Everett Parks and Community Services youth participating in Adventure Camp. <br />