Laserfiche WebLink
Kirk Brooks <br /> From: Erik Emerson <br /> Sent: Wednesday, September 06, 2017 3:36 PM <br /> To: Kirk Brooks <br /> Subject: Hummer Residence <br /> Kirk, <br /> I've gone through the re-submitted plans and report for the Hummer residence. I'm ready to sign off on them, subject to <br /> the following: <br /> 1. Per discussions with the applicant,the recording of a 15 foot drainage easement centered on the HDPE pipe <br /> within the adjacent tract must be recorded prior to final approval. <br /> v' 2. On Sheet 2 the rip-rap pad should be noted as a minimum 12" depth. I think we can just right that in. <br /> 3. The revised plans identify the fused HDPE pipe as DR 11.While DR 11 is certainly acceptable I would also <br /> approve a thinner wall material, up to a DR 32.5. Ultimately the engineer of record should determine the <br /> maximum DR for the pipe. <br /> Erik Emerson PE <br /> City of Everett, Public Works <br /> Senior Surface Water Engineer <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Direct: 425-257-8995, Fax: (425)257-8882 <br /> eemerson@everettwa.gov <br /> 1 <br />