Laserfiche WebLink
Field Rep. Project No. Page 1 of 1 Report No. <br /> Earth Earth Solutions NLLC RWR ES-6132 8 <br /> 'Solutions 1805 136th Place NE, FAX: Time On Site Time Off Site Date Day of Week <br /> NW«c Suite 201 (425)449-4711 <br /> Bellevue,WA 98005 TOLL FREE: 9:00 AM 10:00 AM 12/11/18 Tuesday <br /> (425)449-4704 (866)366-8710 <br /> DAILY FIELD REPORT Travel Time Weather <br /> 0.75 HR RT 45°F, Overcast <br /> Project Name Job Location Client/Owner <br /> Messner Residence 1920 Grand Ave, Everett Bill Messner <br /> General Contractor General Contractor's Superintendent Received Onsite By <br /> BDZ <br /> Grading Contractor Grading Foreman Checked By 12h, <br /> Are approved Plans/Permits onsite YES NO Project No. Permit No. <br /> As requested by the contractor, ESNW representative was onsite to observe lagging installation. <br /> Site Observations: <br /> ESNW rep observed the contractor installing the final rows of lumber lagging between the previously <br /> installed soldier piles. ESNW rep observed the lagging to be installed properly as indicated on approved <br /> site plans. ESNW rep was informed by the contractor 5/8" clean crushed rock would be used as backfill at <br /> a later date. Please see attached image below. <br /> Site Stability: <br /> ESNW rep observed the west-facing slope and <br /> associated excavations observed to be stable in the ". <br /> current condition and configuration and suitable for I A <br /> work to be conducted along the excavation. It is the <br /> responsibility of the contractor to perform all necessary " <br /> safety measure in accordance with state and federal <br /> regulations. <br /> 0.1 Fi <br /> a� <br /> i <br /> ESNW rep will return as requested. F <br /> Wilson Rawlings <br /> Field Technician <br /> COPY TO: CONTINUED ON NEXT PAGE E <br />