My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 E GRAND AVE 2022-02-01
>
Address Records
>
E GRAND AVE
>
2026
>
2026 E GRAND AVE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 1:39:39 PM
Creation date
6/3/2019 3:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
E GRAND AVE
Street Number
2026
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-_-�P-USLICOO-RKS-P-E'RMIT =ate Applied 1/29/2D19-----�— <br />Public Works_Permit#: PWW1901-002 _ <br />- -- -- �--�=-City=of-Everett=Permit-Services -___-. _-�-��-�--�-=- <br />3200 Cedar Street, 2"d Floor Associated Bldg Permit #: W1810-012 <br />Everett, WA 98201 Planning Reference #: <br />(425) 257-8810 Public Works Fee: $90.8 <br />n A KAR a` <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAM?AND ADDRESS: <br />HAESLER DELLA <br />HAESLER DELLA <br />-2026 E GRAND -- ---,.. -.. - - - --- <br />--2026 E GRAND - <br />EVERETT, WA, 98201 <br />EVERETT, WA, 98201 <br />PHONE: _ _ . <br />PHONE: - <br />TAX PARCEL ID #: 00563240702900 <br />-Sift-AD-DRESS: 2026 E GRAND AVE <br />DESCRIPTION: RETAINING WALL IN ROW <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards <br />and Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site work to be done per plans approved by the City of Everett Public Works Department dated 02/06/2019. Approved <br />plans must remain on job -site at all times._ <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everet a.geNf it0 <br />—formally-request-all-required-inspections.- Flyers -are -provided-at-permit-issuance with-instructions-ors-heW40-re9est:An``1) — <br />inspection online. il 3 <br />6. Install and maintain erosion control measures per City of Everett Standards. Remove upor om tietu of thZ project prior <br />to final approval of the permit. `�' <br />e o <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. This wall and all work constructed within the public right -of -way must be removed or relocated at the owner's ex*e a if <br />the City ever requires use of the right-of-way for municipal purposes. t' <br />10. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per Cit tandards and/or as}- <br />directed by the City PW Inspector. <br />tz:1 �. <br />Public Works Permit Fee Breakdown: - <br />Retaining wall in the ROW(127.5 LNFT)... .............$50.80 - `Y <br />PW Plan Review........................................................$20.00 <br />PW Site Inspection....................................................$20.00 <br />City of Everett Official Use Only. _ _ __ _ ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save <br />harmless the City of Everett from any and all claims for damages costs, <br />02 mG ZOl expenses, or causes of action that may arise because of installation and <br />maintenance of the improv ment or other right-of-way use here to applied <br />pprove for Constructi Public Works) Da for and fu a agmove same upon notice from the City and to <br />_ replace p lic rmaged the <br />FINAL, INSPEC RON Date <br />Approved as Constructed (PW Inspector) Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETEION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.