Laserfiche WebLink
From: Ted Schepper f mailto:TSchepperCcbterra-associates.com] <br />Sent: Wednesday, August 03, 2016 4:21 PM <br />To: Andrew Repass <br />Subject: RE: Seaway Center - site retaining wall submittal <br />Request from City of Everett: Please provide methods of inspection(s) to comply with Chapter 17 of the <br />2012 IBC (Special Inspections Chapter). <br />Response: Geotechnical inspections would be as follows: <br />• Site observation of foundation subgrade to verify soil conditions are as expected and suitable for <br />wall foundation. <br />• Observation to verify geogrid reinforcement is being installed per approved design. <br />• Observation to verify wall drainage is installed per approved design. <br />• Observation and compaction testing of wall structural backfill. <br />The above tasks will be completed daily as wall construction is occurring. <br />Terra Associates, Inc. <br />Ted Schepper, P.E. <br />President <br />12220 —113th Avenue NE, Suite 130 <br />Kirkland, WA 98034 <br />Office — 425-821-7777 <br />Cell — 206-396-5783 <br />From: Sabrina Fandler [mailto:SFandler@everettwa.gov] <br />Sent: Wednesday, August 03, 2016 2:31 PM <br />To: Andrew Repass <br />Cc: Steve Miller <br />Subject: RE: Seaway Center - site retaining wall submittal <br />Hi Andy, <br />Below are the comments we talked about for the retaining walls at Seaway Center: <br />1. Please provide a blown up (legible) copy of Figure 14You submitted 2 copies of this today. As a <br />follow-up, I would also like to have the updated Figure 1 sheet for the 8.5"x11" calculations <br />packet. You can sent this to me via email or submit (2) copies for slip -sheeting into the report at <br />the permit counter. <br />2. Please provide (2) copies of the Lock and Load Manufacturer's Installation <br />Instructions/Guidelines. The inspector will need this onside (as well as the contractors). If this is <br />only a few sheets, you can email it to me. <br />3. Please provide methods of inspection(s) to comply with Chapter 17 of the 2012 IBC (Special <br />Inspections Chapter). <br />Feel free to contact the structural reviewer, Steve Miller (cc'd on this email) with any specific questions. <br />Thanks, <br />Sabrina Fandler, EIT, LEED®AP BD+C <br />City of Everett Public Works Department I Development Technician <br />3200 Cedar St, Everett, WA 98201 <br />Office: 425-257-8810 <br />Direct: 425-257-7813 <br />Email: SFandlerCcDeverettwa.gov <br />