My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
>
Address Records
>
SEAWAY BLVD
>
3301
>
WHOLE SITE
>
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 8:09:23 AM
Creation date
6/4/2019 9:20:56 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Sabrina Fandler <br />City of Everett <br />Public Works Department <br />Engineering/Permit Services <br />Response: The <br />location has been <br />concerns raised. <br />August 9, 2016 <br />MWS will have easy access from the pond access road. The <br />reviewed by both MWS and the Geotech engineer with no <br />viii. The drain down line in the first chamber of the MWS must be deleted for installations <br />in the City of Everett because standing water in the vault is the prime indicator of the <br />need to conduct maintenance of the system. It is also the only criteria that can be <br />determined to exist with specific flow and/or water quality monitoring during storm <br />events. <br />Response: The drain down line has been removed from the MWS. <br />ix. Currently, CB #30 is shown as the southern control structure. However, this structure <br />is not easily accessed and the restrictor device must be located in CB #31 instead. <br />CB #30 must function only as an emergency overflow, with either a bee -hive grate or <br />a jailhouse opening, as currently shown. <br />Response: A control structure has been relocated to CB#31 and a bee -hive grate is <br />now shown for CB#30. <br />We believe that the above responses, together with the enclosed revised plans and technical documents, <br />address all of the comments in your July 28, 2016 memorandum. Please review and approve the <br />enclosed at your earliest convenience. If you have questions or need additional information, please do <br />not hesitate to contact me at this office. Thank you. <br />Sincerely, <br />Costa Philippides, P.E. <br />Project Engineer <br />CP/kb <br />17798c.003.doc <br />enc: As Noted <br />cc: Mr. Greg Bertch, Bertch Capital Partners <br />Ms. Kathy Craft, Craft Architect <br />Mr. Daniel K. Balmelli, Barghausen Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.