Laserfiche WebLink
PUBLIC WORKS <br /> iii. I am concerned about the proposed location of the MWS, both from an access <br /> and geotechnical standpoint. The GULD for the MWS requires review and <br /> approval of the site plan by MWS to ensure that site grading and slope are <br /> appropriate for the use of a MWS unit; this review must occur for this site in <br /> addition to specific review of the location by the geotechnical engineer. In order <br /> to aid this review, two cross-sections of the unit must be provided, along its <br /> length and width, showing its location relative to the above grade and to the <br /> rockery between the unit and the NGPE boundary. The City must be provided a <br /> copy of MWS's written approval for the site grading and slope at the location of <br /> the proposed MWS system on-site. <br /> 3. Third Party Geotechnical Reviewer Comments (previous emailed to Barghausen on 10-17- <br /> 2016) <br /> a. We have reviewed the following documents you sent regarding the proposed development at <br /> 3301 Seaway Blvd: <br /> • Response to City of Everett Comments, Seaway Center, 36th Avenue West and Seaway <br /> Boulevard, Everett, Washington,prepared by Terra Associates, Inc., dated August 5, 2016. <br /> • Stormwater Site Plan, Proposed Seaway Center, NEC — 36th Avenue West and Seaway <br /> Boulevard, Everett, Washington, Prepared by Barghausen, revised date August 2, 106. Only <br /> Section 6.0 Special Reports and Studies was reviewed as it contains the original <br /> geotechnical report for the project site. <br /> • Plan Sheets C1-C12 of the Site Development for Bertch Warehouses/Seaway Center, <br /> revised date 8/3/16. <br /> • Lock and Load Retaining Wall Design, Seaway Center, Everett, Washington, reviewed <br /> and approved by Steve Miller, City of Everett 8/10/16. <br /> b. Regarding the slope stability calculations and factors of safety presented by Terra Associates, <br /> we ran slope stability analyses on Cross-Sections A-A' and B-B' as presented in the report <br /> using the program Slide V5.0. Using the soil parameters and geometries presented in the <br /> report, we calculated similar values of factors of safety. We do have concern with the <br /> following issues: <br /> • The stormwater pond sits at the crest of a steep slope. The slope is comprised of dense <br /> glacial till and advance outwash soils. If the pond were to leak, slope stability could be <br /> compromised and sliding could occur. Would an underdrain be feasible that could collect any <br /> leakage and direct it to an appropriate outlet? Is there a way to ensure the pond will not leak? <br /> • The onsite soils are subject to periodic shallow slides/slumps due to weathering of the <br /> upper layers, particularly during extensive wet periods. As the pond crest is located along the <br /> top of the steep slope is there a potential that shallow slides could undermine the pond <br /> embankment? <br /> 3 4/!--27)1 <br /> Page 3 of 4 <br />