My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
>
Address Records
>
SEAWAY BLVD
>
3301
>
WHOLE SITE
>
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 8:09:23 AM
Creation date
6/4/2019 9:20:56 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> iii. I am concerned about the proposed location of the MWS, both from an access <br /> and geotechnical standpoint. The GULD for the MWS requires review and <br /> approval of the site plan by MWS to ensure that site grading and slope are <br /> appropriate for the use of a MWS unit; this review must occur for this site in <br /> addition to specific review of the location by the geotechnical engineer. In order <br /> to aid this review, two cross-sections of the unit must be provided, along its <br /> length and width, showing its location relative to the above grade and to the <br /> rockery between the unit and the NGPE boundary. The City must be provided a <br /> copy of MWS's written approval for the site grading and slope at the location of <br /> the proposed MWS system on-site. <br /> 3. Third Party Geotechnical Reviewer Comments (previous emailed to Barghausen on 10-17- <br /> 2016) <br /> a. We have reviewed the following documents you sent regarding the proposed development at <br /> 3301 Seaway Blvd: <br /> • Response to City of Everett Comments, Seaway Center, 36th Avenue West and Seaway <br /> Boulevard, Everett, Washington,prepared by Terra Associates, Inc., dated August 5, 2016. <br /> • Stormwater Site Plan, Proposed Seaway Center, NEC — 36th Avenue West and Seaway <br /> Boulevard, Everett, Washington, Prepared by Barghausen, revised date August 2, 106. Only <br /> Section 6.0 Special Reports and Studies was reviewed as it contains the original <br /> geotechnical report for the project site. <br /> • Plan Sheets C1-C12 of the Site Development for Bertch Warehouses/Seaway Center, <br /> revised date 8/3/16. <br /> • Lock and Load Retaining Wall Design, Seaway Center, Everett, Washington, reviewed <br /> and approved by Steve Miller, City of Everett 8/10/16. <br /> b. Regarding the slope stability calculations and factors of safety presented by Terra Associates, <br /> we ran slope stability analyses on Cross-Sections A-A' and B-B' as presented in the report <br /> using the program Slide V5.0. Using the soil parameters and geometries presented in the <br /> report, we calculated similar values of factors of safety. We do have concern with the <br /> following issues: <br /> • The stormwater pond sits at the crest of a steep slope. The slope is comprised of dense <br /> glacial till and advance outwash soils. If the pond were to leak, slope stability could be <br /> compromised and sliding could occur. Would an underdrain be feasible that could collect any <br /> leakage and direct it to an appropriate outlet? Is there a way to ensure the pond will not leak? <br /> • The onsite soils are subject to periodic shallow slides/slumps due to weathering of the <br /> upper layers, particularly during extensive wet periods. As the pond crest is located along the <br /> top of the steep slope is there a potential that shallow slides could undermine the pond <br /> embankment? <br /> 3 4/!--27)1 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.