My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Everett 5/4/2019
>
Contracts
>
6 Years Then Destroy
>
2019
>
Port of Everett 5/4/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 10:22:27 AM
Creation date
6/4/2019 10:22:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Everett
Approval Date
5/4/2019
End Date
9/2/2019
Department
Parks
Department Project Manager
Scott Pool
Subject / Project Title
Use of Jetty Island for Jetty Island Days
Tracking Number
0001811
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. remove garbage from Jetty Island and the garbage receptacle at the ticket kiosk on a daily basis <br /> and dispose of at a Parks Department provided dumpster during Jetty Island Days. <br /> 11. offer up to five (5) `Working Waterfront Tours' at no additional cost to the Port of Everett to be <br /> scheduled between Port of Everett and City of Everett staff. <br /> 12. request additional police patrols of the parking lots at Jetty Landing and Boat Launch. <br /> Dated this Day of , 2019 <br /> City of Everett Port of Everett <br /> /2,14 <br /> ";— <br /> a rankfirr, . or Les Reardanz, Port Executi <br /> Director <br /> Approved as to Form: Attest: <br /> m Iles Sharon Fuller, City Clerk <br /> it Attorney <br /> O802 E. Mukilteo Blvd. 0425.257.8300 Recreation@everettwa.gov <br /> Everett, WA 98203 425.257.8325 fax everettwa.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.