My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD Geotech Report 2022-10-25
>
Address Records
>
SEAWAY BLVD
>
3301
>
Geotech Report
>
3301 SEAWAY BLVD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:21:11 AM
Creation date
6/4/2019 11:15:49 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 13,2016 <br /> Project No.T-7342 <br /> 2.0 SCOPE OF WORK <br /> Our work was completed in accordance with our authorized proposal dated December 15, 2015. Accordingly, on <br /> December 29, 2015, we explored subsurface conditions at the site by observing the excavation of 15 test pits to <br /> depths of approximately 8.5 to 17 feet below existing surface grades using a track-mounted excavator. Using the <br /> information obtained from our subsurface explorations and laboratory testing, we performed analyses to develop <br /> geotechnical recommendations for project design and construction. Specifically, this report addresses the <br /> following: <br /> • Soil and groundwater conditions <br /> • Geologic hazards per City of Everett Municipal Code <br /> • Seismic Design Criteria <br /> • Site preparation and grading <br /> • Excavations <br /> • Slopes and embankments <br /> • Foundations <br /> • Floors slabs <br /> • Lateral earth pressure for wall design <br /> • Preliminary Mechanically Stabilized Earth(MSE)Wall Designs <br /> • Stormwater detention pond <br /> • Subsurface drainage <br /> • Utilities <br /> • Pavements <br /> It should be noted that the recommendations outlined in this report regarding drainage are associated with soil <br /> strength, design earth pressures, erosion, and stability. Design and performance issues with respect to moisture <br /> as it relates to the structure environment are beyond Terra Associates' purview. A building envelope specialist or <br /> contractor should be consulted to address these issues,as needed. <br /> 3.0 SITE CONDITIONS <br /> 3.1 __ Surface <br /> The project site is an irregular shaped approximately 16.15-acre parcel located northeast of the intersection of <br /> 36th Avenue West and Seaway Boulevard in Everett, Washington. The approximate location of the site is shown <br /> on attached Figure 1. <br /> Page No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.