Laserfiche WebLink
January 13,2016 <br /> Project No.T-7342 <br /> 2.0 SCOPE OF WORK <br /> Our work was completed in accordance with our authorized proposal dated December 15, 2015. Accordingly, on <br /> December 29, 2015, we explored subsurface conditions at the site by observing the excavation of 15 test pits to <br /> depths of approximately 8.5 to 17 feet below existing surface grades using a track-mounted excavator. Using the <br /> information obtained from our subsurface explorations and laboratory testing, we performed analyses to develop <br /> geotechnical recommendations for project design and construction. Specifically, this report addresses the <br /> following: <br /> • Soil and groundwater conditions <br /> • Geologic hazards per City of Everett Municipal Code <br /> • Seismic Design Criteria <br /> • Site preparation and grading <br /> • Excavations <br /> • Slopes and embankments <br /> • Foundations <br /> • Floors slabs <br /> • Lateral earth pressure for wall design <br /> • Preliminary Mechanically Stabilized Earth(MSE)Wall Designs <br /> • Stormwater detention pond <br /> • Subsurface drainage <br /> • Utilities <br /> • Pavements <br /> It should be noted that the recommendations outlined in this report regarding drainage are associated with soil <br /> strength, design earth pressures, erosion, and stability. Design and performance issues with respect to moisture <br /> as it relates to the structure environment are beyond Terra Associates' purview. A building envelope specialist or <br /> contractor should be consulted to address these issues,as needed. <br /> 3.0 SITE CONDITIONS <br /> 3.1 __ Surface <br /> The project site is an irregular shaped approximately 16.15-acre parcel located northeast of the intersection of <br /> 36th Avenue West and Seaway Boulevard in Everett, Washington. The approximate location of the site is shown <br /> on attached Figure 1. <br /> Page No.2 <br />