My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 HIGHWAY PL WHOLE SITE 2019-06-04
>
Address Records
>
HIGHWAY PL
>
5901
>
WHOLE SITE
>
5901 HIGHWAY PL WHOLE SITE 2019-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 1:27:29 PM
Creation date
6/4/2019 1:27:07 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5901
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
', Date: 8/12/2015 <br /> PUBLIC mJRKS PERMIT Pul,orks Permit#: PW1508-018 <br /> City of Everett Public Works Department <br /> ;s r Ej ads' l"r 3200 Cedar Street Parent Permit#: B1508-016 <br /> Everett, WA 98201 Planning Reference#: SEPA15-006 <br /> (425)257-8810 <br /> Public Works Fee$: $ 25,614.24 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> KULAGA AHMET WELAYE MAHER <br /> 1205 130TH ST SE 15516 56TH AVE W <br /> EVERETT WA 98208 EDMONDS WA 98026 <br /> PHONE: LIR 5—sa I- 6q1) PHONE: <br /> TAX PARCEL ID# 00393200102700 SITE ADDRESS: 5901 HIGHWAY PL BLDG A&B <br /> SITE WORK FOR 2 NEW 9 UNIT TQWNHOUSES+TRAFFIC MITIGATION <br /> BLDG A UNITS 1 THRU 9, BLDG B UNITS 10-18 <br /> BLDG A B1508-016 & BLDG B B1508-017 ARE QN THE SAME SET QF PLANS <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. An irrigation system is required for all landscaped areas and shall be installed prior to i.71 °t 4= <br /> issuance of a Certificate of Occupancy for any building. The applicant shall provide '- ,--°E-- I r� <br /> - <br /> design of the proposed irrigation system to the Planning Department in advance of w ,: :2;LI '. <br /> ; <br /> installation in order to ensure it will meet zoning standards. = ; 4;,-.,;t, i F E.* <br /> 5. Site Civil Work to be done per plans approved by the City of Everett Public Works *1:7-; •= <br /> Department dated 12/29/2015. ' Cr <br /> 6. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior l? C" I;' = <br /> to starting construction and with all other inspection requests. See attached to request >wr1 ';' <br /> an inspection. <i <br /> 7. Install erosion control measures per City of Everett Standards for small parcels. ' '' lam:: F", <br /> Remove erosion control measures upon completion of the project prior to final approval C, ;:.a fa•.a+p <br /> of the permit. a 3` .� <br /> 8. No dirt, mud, rocks, or debris to be tracked onto roadway. Keep City streets clean at ...N.)P,„"?'; a K71 C: C� <br /> all times. W. 8'm'83 c .. <br /> —4,.-...1 K.:, <br /> i 1:-.4 0.) <br /> Cr <br /> Public Works Permit Fee Breakdown: '� O <br /> Asphalt Paving $45.00 a <br /> PW Plan Review$1,003.08 <br /> PW Site Inspection$2,006.16 <br /> Traffic Mitigation $22,560.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> < The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> N /, , <br /> L< „d, / 15 tote causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> App • -. for, On /fi j /' DateP remove same upon notice from the City and to replace public property <br /> 2 �3 damaged thereby. <br /> 7 <br /> FINAL INSP:CION Date -I 2//‘ <br /> Approved a Constructed Sign ture of Applicant kirs- Dat <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION, <br /> fi( C <br />
The URL can be used to link to this page
Your browser does not support the video tag.