My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1632 HOYT AVE 2019-06-04
>
Address Records
>
HOYT AVE
>
1632
>
1632 HOYT AVE 2019-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 1:44:21 PM
Creation date
6/4/2019 1:44:16 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1632
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIVORKS PERMIT Date Applied: 8/16/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1808-040 <br /> 3200 Cedar Street,2"d Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME ANDLlfbR : 2044 <br /> STOHL MAUREEN & BOB PEDERSEN DAVE <br /> 1632 HOYT AVE 385 WEST CROSS ISLAND RD <br /> EVERETT, WA, 98201 CAMANO ISLAND, WA, 98282 <br /> PHONE: PHONE: 3605724879 <br /> TAX PARCEL ID#: 00438034201700 SITE ADDRESS: 1632 HOYT AVE ;;i1 1 <br /> DESCRIPTION: Construct new garage and apron <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 08/16/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting constructigq for <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requestedeeffig <br /> attached handout for phone number and online instructions to Request an Inspection. -; - <br /> ""i <br /> 6. Install and maintain erosion control measures per City of Everett Standards anc riyRVO C.. CA <br /> Rgennove upon <br /> "" u'P'completion of the project prior to final approval of thepermit. cs <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked ohto advay. ; <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced imperus surfacescWi,l be <br /> managed on-site in a manner that does not adversely affect neighboring properties, irluding the City's right-of-way ardor <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of cD cupancy. Call the inspection lin =to <br /> request a Final for this permit when all items have been completed. <br /> '.® • . , ; <br /> 11. Connect side sewer per City Standard#'s 601 through 604. c c�n o c'- CO ' y? <br /> ca cs sc .-01::3 ac• <br /> Public Works Permit Fee Breakdown: <br /> Paving (56SF) $45.00 1-4 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> TO POSTING Spry <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> �,.. a f!Q� maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> ~, <br /> FINAL INSPECTION Date lo cf-' <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> CAE <br /> COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.