Laserfiche WebLink
plied: 6/18/2018 <br /> PUBLI MII/ORKS PERMIT PAL W Dat PApmit#: PWW1806--001 <br /> 0.11111P416/..A City of Everett Permit Services <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: W1803-003 <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $45.00 <br /> C2//9//8 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> DEWITT KEVIN D DUNKINSON CHRIS (CAMPBELL'S PLUMBING) <br /> 3431 LOMBARD AVE 6716 49th St NE <br /> EVERETT, WA, MARYSVILLE, WA, 98270 <br /> PHONE: PHONE: 4258760070 <br /> TAX PARCEL ID#: 00437381801500 SITE ADDRESS: 3431 LOMBARD AVE <br /> DESCRIPTION: REMOVE UNPERMITTED SIDE SEWER AND RESTORE SEWER MAIN <br /> PLUS ASSOCIATED ALLEY RESTORATION. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per code requirements and the City's Design and Construction Standards manual. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation. All inspections must be formally requested. See the attached handout for phone number and online <br /> instructions to Request an Inspection. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPPfPIan. Ranovbaupon <br /> completion of the project prior to final approval of the permit. { <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway -, <br /> 8. Protect all existing underground utilities during construction. ' <br /> 9. Maintain 10' driving clearance around work in alley OR set up"Road Closed Ahead"signs at each end of rit4 <br /> 10. Provide as-built drawings of sewer restoration to PW Inspector prior to final of permit. m <br /> on <br /> 11. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Call the inspectionto <br /> request a Final for this permit when all items have been completed. <br /> ,84 <br /> co <br /> 4 <br /> Public Works Permit Fee Breakdown: Lrl <br /> Misc. Minor Permits $25.00 n <br /> PW Site Inspection $20.00 ext <br /> ' <br /> -4-4 O33' <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> dig4/24 <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> jia2A4 � expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace ublic property damaged thereby. <br /> FINAL INSPECTION Date 1 _ <br /> Approved as Constructed (PW Inspector) Signature of A•• icant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> A1.6 <br />