My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1108 E MARINE VIEW DR 2019-06-04
>
Address Records
>
E MARINE VIEW DR
>
1108
>
1108 E MARINE VIEW DR 2019-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 2:59:10 PM
Creation date
6/4/2019 2:59:07 PM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1108
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC KIRKS PERMIT Date: 7/5/2016 <br /> � f Public Works Permit#: PW1607-004 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: C1605-021 <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> RYAN SCOTT RYAN SCOTT <br /> 1108 E MARINE VIEW DR 1108 E MARINE VIEW DR <br /> EVERETT WA 98201 EVERETT WA 98201 <br /> PHONE: PHONE: 3604343037 <br /> TAX PARCEL ID# 00438722703000 SITE ADDRESS: 1108 E MARINE VIEW DR <br /> SITE WORK FOR NEW CONSTRUCTION OF DETACHED GARAGE <br /> HEIGHT SURVEY REQUIRED PRIOR TO FRAMING INSP. <br /> EVERETT DIV T PLAT OF BLK 227 <br /> D-00- N1/2 LOT 30 &ALL LOTS <br /> 31-32-33 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 ; ..s;in <br /> 4. Connect side sewer to garage per City Standard#601. request inspection prior to 1-. -.0 1-i*r-L 1--••r-•• Li ' <br /> covering -� -Ir-,1:c„ -r F. =,:_.„-:, _.. <br /> 5. KeepCitystreets clean at all times. No dirt, mud, rocks, or debris toy ra d orrt'�y •' a=� W <br /> r � T t 7 --,-sir, <br /> r1 1'x"7 I-. <br /> roadway. 0 x� CO<= <br /> 6. Downspouts for new garage shall discharge to splash blocks. ,=' p"I <br /> ;,:,,_� <br /> 7. Stormwater from new impervious surfaces shall not be discharged, through ; �;; <br /> downspouts or other direct pipe connections, into a combined sewer, including a lateral `-- 1� 0 <br /> line or side sewer connected to the City's combined sewer system as per EIC Chapter <br /> 14.08.180 H. -.. ,:.`� <br /> 8. It is the applicant/owner's responsibility to ensure that stormwater runoffm new <br /> impervious surfaces will be managed on-site in a manner that does not 'ers f ,c, „; !i el ; ;r; ;;51 <br /> r—, <br /> neighboring properties, including the City's right-of-way and/or easemellAa"d a`ti',n <br /> improvements located therein. -1 C._ <br /> a , <br /> 9. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior -=:; Exici <br /> to starting construction and with other inspection requests. See attached to request an Cr <br /> inspection <br /> 0 <br /> Public Works Permit Fee Breakdown: <br /> Misc. Minor Permits $25.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> e 7—.5--/L causes of action that may arise because of installation and maintenance of the <br /> A r ed for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> pp remove same upon notice from the City and to replace public property <br /> damage reby. <br /> FINAL INSPECTION Date fr' /� <br /> Approved as Constructed Si. . ure of Applicant /4/ <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.