Laserfiche WebLink
Geotechnical Plan Review and Comment Memorandum NGA File No.974316 <br /> Scriven Residence Improvements December 7,2016 <br /> Everett,Washington Page 3 <br /> All recommendations presented in the previous geotechnical report and this memo should be followed <br /> during construction. A copy of our previous report and this memo should be provided to your contractor <br /> prior to work beginning on this project. We recommend that NGA be retained to provide monitoring and <br /> consultation services during construction to confirm that the conditions encountered are consistent with <br /> those indicated by the explorations,to provide recommendations for design changes should the conditions <br /> revealed during the work differ from those anticipated, and to evaluate whether earthwork activities <br /> comply with contract plans and specifications. <br /> We trust this memorandum should satisfy your needs at this time. Please contact us if you have any <br /> questions or require additional services. <br /> o-o-o <br /> 02) NELSON GEOTECHNICAL ASSOCIATES INC. <br />