Laserfiche WebLink
INSPECTION REPORT <br /> n..� Date (*Vie Permit: ��05— <br /> il‘`t, Contractor: O bo rb-e. Coori d-fan_ <br /> 'R' Wner: 14609 hufhiY_tbL' Evetdb <br /> Site Address:X7 3 12:th St <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains 5 Refrigeration ❑Rough in <br /> ❑Roof drains ;:!Building Final ((��ti:^ as Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: I25 9_ 9550 <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED .. <br /> ❑ fFO11.____ ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: P F: Date: /0 -- <br /> —7 /p <br /> EIR(10/06) DATABAR,INC. <br />