My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12319 14TH DR SE 2019-06-05
>
Address Records
>
14TH DR SE
>
12319
>
12319 14TH DR SE 2019-06-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:51:32 AM
Creation date
6/5/2019 10:51:30 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH DR SE
Street Number
12319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVER-THE-COUNTER ELECTRICAL PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist and use a template electrical diagram provided by the City or other approved diagram.All <br /> project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> © Project Information <br /> Property Owner Name., David Caldwell <br /> Project Address: 12319 14th Dr SE Parcel# <br /> City. Everett State WA' " ZIP: 98208 <br /> Day Phone; (425)985-113.5 <br /> Contractor Name A&R SOLAR <br /> Contractor License# RSOLAR*903JM <br /> AR'903JM <br /> Contractor Da Phoney ';206-7 <br /> Y 07-9937 <br /> PV system description Installing a 2.7 kW Photovoltaic System on the roof, <br /> {include manufacturer (9) Itek Energy 300W <br /> and model#of PV (5) Blue Frog YC500A-MIW <br /> modules and <br /> inverters): <br /> ©Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,inverters,and combiner boxes are identified for use in PVY systems,sem 1 <br /> 2 � labeled <br /> -Jh nve>;ters ate listed and in accordance with UL 1741 and are,listed for 171 ❑ <br /> utilty'interaction. [I RC M2302.4] <br /> 3. The AC interconnection point is on the load side of service disconnect.[NEC 690.64(B)] ❑' <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code <br /> requirements. <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service El <br /> s <br /> disconnects. <br /> 6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(D)(2)(3)(b),and is limited to(check combination that <br /> applies): <br /> 0225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> 0225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter OCPD. <br /> iii200 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter OCPD. <br /> ❑150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> ❑125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp inverter OCPD. <br /> 0125 amp bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp inverter OCPD. <br /> 1: <br />
The URL can be used to link to this page
Your browser does not support the video tag.