Laserfiche WebLink
OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> She ion Property Owner Name: David Caldwell <br /> P ect Address: <br /> ;12319 14th Dr SE Parcel# <br /> City Everett State;Witt ZIP: 982°8 <br /> Day ( ) <br /> i� : � � 425 985-1135 <br /> Contractor Name A&R SOlar <br /> Contractor License#: RSOLAS*903JM <br /> Contractor Day Phone: 206-707-99337 <br /> PV system description Installing a 2.7 kW Photovoltaic System on the roof., <br /> (include manufacturer (9) Itek Energy 300W <br /> and model#of PV (5) Blue Frog YC500A-MIW <br /> modules and <br /> inverters; <br /> • <br /> oDetermine if your project qualifies for expedited permitting: <br /> 1 Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that ❑ <br /> I ' lis code compliant to setbacks and height,or code allows expansion, fnonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not`exceed°`the highest point of the roof unless approved by 121 , <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such as a single layer of composition shingles, is ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. !J <br /> 4 The installation shall comply with the manufacturer's instructions.[IRC M2302.2] ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to , iz <br /> 0 <br /> administer the electrical code. [IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended % <br /> by WA State. [IRC M2302.2] Lr . CI <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per ' <br /> 71 0 <br /> the manufacturer's specifications.[IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] ,� t Cl <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances 1 <br /> weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] , <br /> Enter total dead load of system(Ibsjft2): , <br /> 10: To address uplift,modules are mounted no higher than 18"above the surface of the <br /> roofing to which they are affixed. [IRC M2302.2.1(4)] <br /> 1; <br />