My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 5/15/2019 Change Order 1
>
Contracts
>
Capital Contract
>
Stellar J Corporation 5/15/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 9:30:17 AM
Creation date
6/10/2019 9:30:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
5/15/2019
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001332
Total Compensation
$38,725.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 7/24/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Process Water Pump Station <br /> Change Order No.1 <br /> Change Order Effective Date: April 15, 2019 <br /> t " <br /> CONTRACTOR � , , <br /> By ' r Date: q/2 7 / �? <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 1 adds one new item to the Contract as shown below. <br /> Added Item <br /> New Item#4—Furnish Automatic Duplex Priming System.Add new item#4 entitled, "Furnish <br /> Automatic Duplex Priming System"at the agreed to lump sum price of$38,725.00 by adding One(1) <br /> to the Contract, resulting in a$38,725.00 increase to the Contract price. This price includes four(4) <br /> additional priming valves and one(1) water trap. <br /> JUSTIFICATION <br /> New Item#4—Furnish Automatic Duplex Priming System. The current priming system in use at <br /> the Process Water Pump Station is inadequate due, to the upgrades currently being constructed as part <br /> of this project. The additional pumps being installed have higher inlet elevations and a larger <br /> combined suction volume than the existing pumps, and therefore, a larger capacity pump priming <br /> system is required to ensure that the water pumps remain in a flooded condition, which will provide <br /> water for the WFP processes at all times, which is critical. This upgraded pump priming system <br /> provides the increased priming capacity necessary to prime the new pump system at the City of Everett <br /> Water Filtration Plant(WFP). This new item is being added to account for costs to purchase this <br /> Automatic Duplex Priming System. <br /> Total Cost of Change Order No. 1: $38,725.00 <br /> Contract Time: There are Thirty(30) Calendar days added to the Contract time in Change <br /> Order No. 1,to allow for time to acquire,install, and test Automatic Duplex Priming System <br /> onsite at the Process Water Pump Station. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.