My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 5/23/2019 Change Order 2
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 5/23/2019 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 9:47:30 AM
Creation date
6/10/2019 9:47:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
5/23/2019
Department
Public Works
Department Project Manager
Rich Hefti
Subject / Project Title
Watermain Replacement "T"
Public Works WO Number
UP3684
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001600
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc 12/27/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Watermain Replacement "T" <br /> Change Order No.2 <br /> Change Order Effective Date: May 2, 2019 <br /> CONTRACTOR <br /> Byc9"0/ZDate: 3 <br /> -C / Q <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> Schedule A <br /> This Change Order No. 2 adds one (1) new item and modifies two (2) existing bid items to Schedule A <br /> of the Contract as shown below. This Change Order No. 2 also adds one (1) new item to Schedule B <br /> of the Contract as shown below. <br /> Added Bid Items <br /> Schedule A <br /> Item# 101 -Additional Concrete, Asphalt, Miscellaneous Debris-Removal and Disposal. Add <br /> new item entitled, "Additional Concrete, Asphalt, Miscellaneous Debris-Removal and Disposal" at the <br /> agreed to lump sum price of$51,733.00, resulting in a$51,733.00 increase to the Contract price. <br /> Schedule B <br /> Item# 57-Mukilteo Boulevard Utility Conflicts. Add new item to Schedule B of the Contract <br /> entitled, "Mukilteo Boulevard Utility Conflicts" at the agreed to lump sum price of$6,654.00, <br /> resulting in a$6,654.00. <br /> Modified Bid Items <br /> Bid Item #A-5-Traffic Control Labor. Modify existing Bid Item#A-5 entitled, "Traffic Control <br /> Labor" at the Contract unit price of$57.00/hour, by adding 1,000 hours to the Contract, resulting in a <br /> $57,000.00 increase to the Contract price. <br /> Bid Item #A-40-Crushed Surfacing Top Course. Modify existing Bid Item#A-40 entitled, <br /> "Crushed Surfacing Top Course" at the Contract unit price of$58/Ton, by adding 150 tons to the <br /> Contract, resulting in an $8,700.00 increase to the Contract price. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.