Project: Watermain Replacement "T" <br /> Change Order No.2 <br /> Change Order Effective Date: May 2, 2019 <br /> CONTRACTOR <br /> Byc9"0/ZDate: 3 <br /> -C / Q <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> Schedule A <br /> This Change Order No. 2 adds one (1) new item and modifies two (2) existing bid items to Schedule A <br /> of the Contract as shown below. This Change Order No. 2 also adds one (1) new item to Schedule B <br /> of the Contract as shown below. <br /> Added Bid Items <br /> Schedule A <br /> Item# 101 -Additional Concrete, Asphalt, Miscellaneous Debris-Removal and Disposal. Add <br /> new item entitled, "Additional Concrete, Asphalt, Miscellaneous Debris-Removal and Disposal" at the <br /> agreed to lump sum price of$51,733.00, resulting in a$51,733.00 increase to the Contract price. <br /> Schedule B <br /> Item# 57-Mukilteo Boulevard Utility Conflicts. Add new item to Schedule B of the Contract <br /> entitled, "Mukilteo Boulevard Utility Conflicts" at the agreed to lump sum price of$6,654.00, <br /> resulting in a$6,654.00. <br /> Modified Bid Items <br /> Bid Item #A-5-Traffic Control Labor. Modify existing Bid Item#A-5 entitled, "Traffic Control <br /> Labor" at the Contract unit price of$57.00/hour, by adding 1,000 hours to the Contract, resulting in a <br /> $57,000.00 increase to the Contract price. <br /> Bid Item #A-40-Crushed Surfacing Top Course. Modify existing Bid Item#A-40 entitled, <br /> "Crushed Surfacing Top Course" at the Contract unit price of$58/Ton, by adding 150 tons to the <br /> Contract, resulting in an $8,700.00 increase to the Contract price. <br /> Page 3 of 4 <br />